BASE HEADER

Do you support or object to the development of Glebe Farm, Cubbington?

Yn dangos sylwadau a ffurflenni 751 i 780 o 903

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44969

Derbyniwyd: 31/03/2010

Ymatebydd: Tony Millsopp

Crynodeb o'r Gynrychiolaeth:

Object

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44970

Derbyniwyd: 31/03/2010

Ymatebydd: Roger Beard

Crynodeb o'r Gynrychiolaeth:

1. Cubbington would be connected to Lillington creating one large urban sprawl.
2. The existing road system could not handle the increase in traffic and would increase the already overcrowded roads in the area.
3. Cubbington village already suffers very bad flooding problems. This could only be made worse, by the lack of drainage currently existing by new development.
4. Building on greenbelt should not take place. The Planning Department/ Council have in the past, avoided joining Sydenham to Radford Semele for all the same reasons that would affect Cubbington.
5. Detrimental effect on wildlife.
6. Lack of infrastructure to support this development i.e. schools, doctors, work.
7. Loss of Cubbington village identity.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44971

Derbyniwyd: 31/03/2010

Ymatebydd: Paul Haynes

Crynodeb o'r Gynrychiolaeth:

Object

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44972

Derbyniwyd: 31/03/2010

Ymatebydd: David Riman

Crynodeb o'r Gynrychiolaeth:

On the grounds of over development

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44973

Derbyniwyd: 31/03/2010

Ymatebydd: Richard Betts

Crynodeb o'r Gynrychiolaeth:

Object

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44974

Derbyniwyd: 31/03/2010

Ymatebydd: Mrs C A Parker

Crynodeb o'r Gynrychiolaeth:

Everyone I have spoken to is extremely concerned that village life as we know it will quite possibly disappear. This is totally unacceptable! Apart from this, there is enormous concern about building on an area which is prone to severe flooding. There is currently a lack of doctors; schools etc in this area and the increase in traffic would be huge. The impact on flora and fauna would be devastating and the entire plan fills me and many others with horror.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44975

Derbyniwyd: 31/03/2010

Ymatebydd: Maureen & David Townsend

Crynodeb o'r Gynrychiolaeth:

Please keep the green spaces round our towns. We need our breathing spaces. Cubbington and Offchurch must be kept separate from Lillington. This is good agricultural land. More houses will need wider loads, bigger roundabouts, more traffic. It may well cause more flooding in Cubbington Village. There will be more accidents in the narrow lands around Offchurch.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44976

Derbyniwyd: 31/03/2010

Ymatebydd: Ron Ward

Crynodeb o'r Gynrychiolaeth:

1. Warwick Gates 2 - no thanks
2. Schools and doctors wouldn't cope
3. Traffic congestion would be unbearable
4. More countryside and wildlife would disappear
5. Say yes to keep village life

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44977

Derbyniwyd: 31/03/2010

Ymatebydd: Mrs Evelyn Casey

Crynodeb o'r Gynrychiolaeth:

1. Increase traffic on Cubbington Road and Rugby Road
2. More congestion at Windmill Hill, Rugby Road, Kenilworth Road roundabout which is already an accident hot spot.
3. Loss of well used public footpaths
4. Cubbington is a village with a local thriving community and no wish to be joined onto Lillington.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44978

Derbyniwyd: 31/03/2010

Ymatebydd: Nolan Robertson

Crynodeb o'r Gynrychiolaeth:

The strategic plan to council's preferred sites have sufficient space to accommodate all future housing requirements to 2026.
Employment is in the South of Leamington and there are no sufficient river crossings to take 3000 extra vehicles to the growing employment centres.
Light pollution from extra houses will make it near impossible to stargaze.
Proposed access routes are insufficient for the projected volume of traffic.
Any new development will effectively be a 'dormer' estate with residents travelling to their place of work on already stretched road infrastructure.
Village life in Cubbington will be eroded.
Cubbington is a village and should be retained.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44979

Derbyniwyd: 31/03/2010

Ymatebydd: Shirley Rush

Crynodeb o'r Gynrychiolaeth:

1. Development would produce greatly increased traffic, particularly from Parklands Avenue. There are current difficulties coming on to the Rugby Road at peak times. Increased traffic would exacerbate the problem.
2. If this building were to go ahead, Cubbington would lose its special rural identity and just be part of Leamington.
3. The wildlife in this area is special- is this to be a thing of the past?
4. Flooding will inevitable occur more often. The floods have been a disaster in some areas.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44980

Derbyniwyd: 31/03/2010

Ymatebydd: Janet Statham

Crynodeb o'r Gynrychiolaeth:

I do not feel the village of Cubbington can support the influx of extra people. We have enough parking problems at the shops and schools at the present, and the extra traffic, the roads are only village roads and cannot support this. Also the schools couldn't take the extra influx of children. Apart from this the development would spoil some of the greenbelt land.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44981

Derbyniwyd: 31/03/2010

Ymatebydd: J & A Haynes

Crynodeb o'r Gynrychiolaeth:

We object to the development because of the unsuitability of the site and the strain on the infrastructure it will cause.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44982

Derbyniwyd: 31/03/2010

Ymatebydd: Mr Robert Watts

Crynodeb o'r Gynrychiolaeth:

This development would cause a great increase in traffic, therefore leading to more pollution and accidents. Schools and doctors are already under pressure. The flooding problems with Cubbington Village are well documented.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44983

Derbyniwyd: 31/03/2010

Ymatebydd: Mrs Annette Peake

Crynodeb o'r Gynrychiolaeth:

- Erosion of greenbelt - unacceptable
- Destruction of the environment - tragic
- Real threat of flooding
- Unacceptable increase in traffic.
- Pressure on local schools and doctors
- This proposal poses an unacceptable level of disruption to the area, which is not adequate to cope with such an influx of new users.
- Loss of fertile land, regularly farmed
- Outstanding, beautiful are that supports all manner of wildlife. This must be preserved for future generations of Cubbington and Lillington residents. It would be a tragedy to let this proposal go ahead.
- We don't want to lose our village!

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44984

Derbyniwyd: 31/03/2010

Ymatebydd: Mr David J Stanley

Crynodeb o'r Gynrychiolaeth:

This labour government and council seem hell bent on destroying our wonderful countryside, whom thousands of people from overseas come to enjoy every year.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44985

Derbyniwyd: 31/03/2010

Ymatebydd: Mr & Mrs Dean

Crynodeb o'r Gynrychiolaeth:

The drainage problem which has been experienced recently makes it known only too wall that unless works proposed includes action to prevent any further problem in and around Cubbington.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44986

Derbyniwyd: 31/03/2010

Ymatebydd: Mrs Amanda Watts

Crynodeb o'r Gynrychiolaeth:

Object strongly. Increase in traffic will cause more accidents and produce more pollution. Doctors' surgeries are already full to capacity. There is insufficient parking for shops in Queen Street and opposite the Rugby Tavern to cater for huge additional numbers of residents. Also existing schools could not cater for them. The footpath across the fields is used heavily and wildlife must be protected.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44987

Derbyniwyd: 31/03/2010

Ymatebydd: B M Langsdale

Crynodeb o'r Gynrychiolaeth:

Object

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44988

Derbyniwyd: 31/03/2010

Ymatebydd: Andrew Bailey

Crynodeb o'r Gynrychiolaeth:

A development of the size and nature of that proposed would destroy the village community of Cubbington and place significant strain on an already inadequate infrastructure of schools, roads and leisure facilities. The area also suffers from flooding and such a development can only impart negatively on the village's ability to cope with adverse weather conditions.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44989

Derbyniwyd: 31/03/2010

Ymatebydd: Thelma Dillow

Crynodeb o'r Gynrychiolaeth:

Object

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44990

Derbyniwyd: 31/03/2010

Ymatebydd: Prof. Jacky Swan

Crynodeb o'r Gynrychiolaeth:

Very negative impact on Cubbington and surrounding area due to:
i. Traffic on the Welsh Road and Windmill Hill would increase in volume. The Welsh Road is already quite dangerous and Windmill Hill is congested
ii. Flooding Risk
iii. Loss of village boundary between Cubbington and Lillington will severely detract from village life and the local community
iv. Environment - loss of greenbelt and well used open space.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44991

Derbyniwyd: 31/03/2010

Ymatebydd: Edward Charles Coggins

Crynodeb o'r Gynrychiolaeth:

1. The greenbelt between Lillington and Cubbington must be protected otherwise Leamington will sprawl outwards and village life will be destroyed.
2. Once you build on this greenbelt there will be no reason not to build on more land
3. There is bad flooding already in Cubbington, putting more tarmac on can only make the flooding worse.
4. The existing road network is already very busy. It cannot support all these extra houses. There are already many accidents at the top of Windmill Hill and crossing Rugby Road to the shops is difficult and dangerous
5. There will be too much pressure on local schools and doctors.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44992

Derbyniwyd: 01/04/2010

Ymatebydd: Harry Scarbrough

Crynodeb o'r Gynrychiolaeth:

Impact on Cubbington village and area highly negative. Increased traffic and pressures on schools etc. Reduction in greenbelt and inappropriate location for major development.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44994

Derbyniwyd: 31/03/2010

Ymatebydd: George Vickers

Crynodeb o'r Gynrychiolaeth:

I object to the proposal for the following reasons:
1. It will spoil the village life
2. It will increase the possibility of flooding
3. It will make the traffic problems in the village worse
4. It will make the greenbelt no longer green.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44995

Derbyniwyd: 01/04/2010

Ymatebydd: Mrs Muriel Vickers

Crynodeb o'r Gynrychiolaeth:

I object to the plans to develop the greenbelt between Lillington and Cubbington. Cubbington maintains its village way of life, which I'm sure would be lost if we joined with Lillington. Also the roads are very busy with today's traffic without adding more.
I enjoy walking over the fields, blackberrying and a friendly short cut to the Rugby Tavern and shops, please don't spoil this for Cubbington.

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44997

Derbyniwyd: 09/07/2010

Ymatebydd: Mr and Mrs R.C. Milton

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

We do not nee the amount of houses and to link up with Lillington, and so on to Leamington Spa.

Have you thought of the traffic, road and the upset to the village and the shops, school and it goes on and on.

We as the old Cubbington villagers do not want to see the end of village life.

Sylw

Alternative Sites Consultation

ID sylw: 45033

Derbyniwyd: 08/04/2010

Ymatebydd: Bishops Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

BTPC comment that the entire site is not appropriate for full development. The eastern part adjacent to Lillington is on a ridge. This forms the natural boundary to any extension of Lillington. However, a western extension to Cubbington is possible and will present minimal visual impact owing to the topography. We consider the north-eastern 10.3ha to be suitable for 325 homes as shown below [shown in full BTPC full submission]. Of course, any such development would be expect to provide flood alleviation measures as part of the S106 agreement.

Sylw

Alternative Sites Consultation

ID sylw: 45040

Derbyniwyd: 09/04/2010

Ymatebydd: Warwickshire County Council (Minerals Policy Team)

Crynodeb o'r Gynrychiolaeth:

There could be deposits of sand and gravel within this site.

Sylw

Alternative Sites Consultation

ID sylw: 45046

Derbyniwyd: 09/04/2010

Ymatebydd: Warwickshire County Council - Landscape Architect Team

Crynodeb o'r Gynrychiolaeth:

This site is on Green Belt and Grade 3 farmland with a small fragment of Grade 2 farmland affected on the southern boundary. The development would fall within Dunsmore Plateau Farmlands and Plateau Fringe. Although Lillington and Cubbington are already physically connected the proposed site is on higher ground that the surrounding area so there will be visual impact issues, particularly with the scale of development proposed. A landscape buffer would be needed to both break up the scale and screen the development from the school and its playing fields and from the adjacent farm and its associated buildings.