BASE HEADER

Barford

Yn dangos sylwadau a ffurflenni 1 i 18 o 18

Gwrthwynebu

Preferred Options

ID sylw: 46522

Derbyniwyd: 17/07/2012

Ymatebydd: Barford, Sherbourne and Wasperton Joint Parish Council

Crynodeb o'r Gynrychiolaeth:

BARFORD in particular is concerned that directing significant levels of growth to villages will overload local infrastructure beyond what is reasonable - specifically whilst the school is adequate for current needs and could take modest increases the proposal of 100 extra homes will cause gross overloading well beyond plans for single form entry.

Gwrthwynebu

Preferred Options

ID sylw: 46650

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Rod Scott

Crynodeb o'r Gynrychiolaeth:

Allocation of new housing in category 1 villages is not in proportion to their existing size.
Recent history of growth of housing in each village is not taken into consideration.
The growth of housing in small villages should be phased over the full period of the plan.

Gwrthwynebu

Preferred Options

ID sylw: 46817

Derbyniwyd: 25/07/2012

Ymatebydd: Mr Ken Hope

Crynodeb o'r Gynrychiolaeth:

100 new dwellings in Barford is too high a rate of increase cf the size of the village. Also at a greater rate than proposed for the urban area of WDC. This would also overwhelm particular roads.

Barford's community has worked hard for and won good facilities in spite of its small size but is now defined as a 'Category 1' village. Its community strength exists primarily because the village has grown at a steady rate and it has been able to absorb any newcomers. Increasing the rate of building new dwellings will destroy this community spirit.





Gwrthwynebu

Preferred Options

ID sylw: 46847

Derbyniwyd: 02/08/2012

Ymatebydd: Barford Residents Association

Crynodeb o'r Gynrychiolaeth:

Barford should not be considered as a category 1 village and thus allocated a lower level of growth

Gwrthwynebu

Preferred Options

ID sylw: 47859

Derbyniwyd: 23/07/2012

Ymatebydd: mrs angela watkins

Crynodeb o'r Gynrychiolaeth:

Building 100 houses in Barford will put a strain on the existing facilities, particularly the village school. Insisting on 40% affordable homes, even if they are not required by Barford residents, does not seem reasonable.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 47893

Derbyniwyd: 27/07/2012

Ymatebydd: Warwickshire Gardens Trust

Crynodeb o'r Gynrychiolaeth:

Potential for damage to the character of neighbourhoods and adjacent sites.

We hope that land at Barford House, a locally registered landscape, will not be assigned for part of the allocation.

Gwrthwynebu

Preferred Options

ID sylw: 48141

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Chris Murphy

Crynodeb o'r Gynrychiolaeth:

The requirement for Barford in particular to absorb 100 extra homes is excessive. The village is not sufficiently connected to local towns, and the village school would be unable to cope with the resulting number of new pupils. The allocation of houses to category 1 villages should not be made a 'blanket' allocation but take into account the present population as well as the infrastructure of the village.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48142

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Chris Murphy

Crynodeb o'r Gynrychiolaeth:

I strongly object to the size of this proposed site and the number of homes proposed. It can only add to an already problematic area in terms of travel time, particularly at peak times. The site will cause unnecessary loss of agricultural land and important rural landscape and will impact on the approaches to our local towns. It will also result in the risk of further infill. Please consider limiting the size of the development and utilising other sites.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48285

Derbyniwyd: 26/07/2012

Ymatebydd: John Watkins

Crynodeb o'r Gynrychiolaeth:

Provision of 100 extra homes is much too large for the village to absorb and will generate excessive traffic, especially on the Barford by-pass T junctions, and cannot be supported by the existing education facilities.

The foul sewer from Barford to Warwick does not have capacity for a development of this size.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48478

Derbyniwyd: 27/07/2012

Ymatebydd: Rachel Hargreaves

Crynodeb o'r Gynrychiolaeth:

Objects to large scale development in Barford by extending the village envelope and allocating such a large number of houses to the village it would be out of scale with the environs and will have a detrimental impact on the area. It is proposed that the distribution of the development is reviewed with further consideration and the Barford allocation is reduced dramatically to a figure that is more akin with the existing village and of appropriate scale.

Gwrthwynebu

Preferred Options

ID sylw: 48482

Derbyniwyd: 27/07/2012

Ymatebydd: Rachel Hargreaves

Crynodeb o'r Gynrychiolaeth:

It should be questioned whether Barford should be considered a more sustainable location as any new homes in the area are likely to increase car-bourne journeys, congestion and pollution in the village. Barford as a Category 1 village has 3 times the projected level of development than a Category 2 village, but Cubbington (category 2 village) has a substantial level of facilities in comparison with Barford, yet it is only required to allow for 30 dwellings.

Gwrthwynebu

Preferred Options

ID sylw: 48486

Derbyniwyd: 27/07/2012

Ymatebydd: Rachel Hargreaves

Crynodeb o'r Gynrychiolaeth:

The countryside surrounding the village forms part of the character for Barford. It also houses an abundance of wildlife along with offsetting the risk of flooding.

Gwrthwynebu

Preferred Options

ID sylw: 48765

Derbyniwyd: 06/07/2012

Ymatebydd: Peter and Philippa Wilson

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

We aknowledge that we have to accept some share of required development, but it is ironic that as a community we have made huge efforts to save our school from closure and when faced with the closure of the only shop, opened our own community shop. We are now category 1 village expected to take 100 houses. If we had done nothing we would probably be category 2.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49098

Derbyniwyd: 02/08/2012

Ymatebydd: Savills

Crynodeb o'r Gynrychiolaeth:

Although Taylor Wimpey supports the proposal for category 1 villages, Barford may be able to accommodate dwelling growth in excess of 100 units. We suggest that the council sets out a dwelling range with minimum and maximum numbers that might be acceptable for Barford. Furthermore if some villages (category 1 and 2) are unable to meet broad targets set then other villages may need to make up the shortfall. An assessment of likely housing capacity in each village is required to understand what the housing capacity parameter should be.

Gwrthwynebu

Preferred Options

ID sylw: 49723

Derbyniwyd: 06/07/2012

Ymatebydd: Peter and Philippa Wilson

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

Villagers have worked hard to retain local school and village shop. It therefore seems unfair that it is now a categroy 1 village - if villagers had done nothing, then a lower level of housing would be proposed.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 49748

Derbyniwyd: 20/07/2012

Ymatebydd: Coventry Diocesan Board Of Finance Ltd.

Asiant : Godfrey-Payton

Crynodeb o'r Gynrychiolaeth:

Support proposals for 100 houses at Barford. In particular would like to suggest a site owned by the Coventry Diocesan Board. This land is available. It is consistent with the RSS and could provide for much needed development on the settlement fringe. It has the potential to deliver affodable housing and would provide a sustainable development being close to transport links. This site would help support existing rural services and employment at the same time as being close to the urban areas.
It has a potential access and could deliver approx. 12 housing units.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 49767

Derbyniwyd: 20/07/2012

Ymatebydd: Trustees Of Warwick Charities

Asiant : Godfrey-Payton

Crynodeb o'r Gynrychiolaeth:

Support proposals for development for Category 1 and 2 villages and specifically request land at Barford owned by them to be taken in cosideration when assessing sites at Barford.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 50761

Derbyniwyd: 19/02/2013

Ymatebydd: Mr R Ogg

Asiant : Keyhaven Consulting Limited

Crynodeb o'r Gynrychiolaeth:

Provision of 100 houses is supported. Village has good range of services and public transport to nearby towns
Promoting area fronting Wellesbourne Road and A429 Barfod by-pass accessed by Westham Lane.
Self contained and sustainable location well related to settlement pattern where new housing can be provided without harm to historic core.
0.81ha capableof development within phase one.

Atodiadau: