BASE HEADER

PO17: Culture & Tourism

Yn dangos sylwadau a ffurflenni 31 i 60 o 139

Cefnogi

Preferred Options

ID sylw: 51331

Derbyniwyd: 27/07/2012

Ymatebydd: Jane Toogood

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51341

Derbyniwyd: 27/07/2012

Ymatebydd: Faz Subhani

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51351

Derbyniwyd: 27/07/2012

Ymatebydd: Mr & Mrs Tom & Frances Wyatt

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51361

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Josephine Wilcox-Smith

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51371

Derbyniwyd: 27/07/2012

Ymatebydd: Lauren Popinall

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51381

Derbyniwyd: 27/07/2012

Ymatebydd: michael mcmillan

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51391

Derbyniwyd: 27/07/2012

Ymatebydd: Frances Nolan

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51401

Derbyniwyd: 27/07/2012

Ymatebydd: Anthony Bourne

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51411

Derbyniwyd: 27/07/2012

Ymatebydd: Victoria Bourne

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51421

Derbyniwyd: 27/07/2012

Ymatebydd: Matt Bourne

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51431

Derbyniwyd: 27/07/2012

Ymatebydd: Rachel Sparkes

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51441

Derbyniwyd: 27/07/2012

Ymatebydd: Simon Cartwright

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51451

Derbyniwyd: 27/07/2012

Ymatebydd: Sam Davies

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51461

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Roland Crisp

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51471

Derbyniwyd: 27/07/2012

Ymatebydd: D W Rogers

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51481

Derbyniwyd: 27/07/2012

Ymatebydd: mr tim landreth

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51491

Derbyniwyd: 27/07/2012

Ymatebydd: James Robins

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51501

Derbyniwyd: 27/07/2012

Ymatebydd: Charley May

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51511

Derbyniwyd: 27/07/2012

Ymatebydd: Peter Jackson

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51521

Derbyniwyd: 27/07/2012

Ymatebydd: Katie Bard

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51531

Derbyniwyd: 27/07/2012

Ymatebydd: Jackie Mullen

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51541

Derbyniwyd: 27/07/2012

Ymatebydd: J Schirmer

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51551

Derbyniwyd: 27/07/2012

Ymatebydd: Colin Perry

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51561

Derbyniwyd: 27/07/2012

Ymatebydd: Fiona Miller

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51571

Derbyniwyd: 27/07/2012

Ymatebydd: C Jorgensen

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51581

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Mary Calderbank

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51591

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Gillian Crisp

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51601

Derbyniwyd: 27/07/2012

Ymatebydd: Je Bewick

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51621

Derbyniwyd: 27/07/2012

Ymatebydd: Mark Robins

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Cefnogi

Preferred Options

ID sylw: 51631

Derbyniwyd: 27/07/2012

Ymatebydd: Sara Dixon

Crynodeb o'r Gynrychiolaeth:

Supportive of the policy but would not wish to see development jeopardise the attraction of Norton Linsey village to visitors.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details: