ID sylw: 51732
Derbyniwyd: 27/07/2012
Ymatebydd: Peter Grady
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51742
Derbyniwyd: 27/07/2012
Ymatebydd: Katie Landreth
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51752
Derbyniwyd: 27/07/2012
Ymatebydd: Hannah Laming
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51762
Derbyniwyd: 27/07/2012
Ymatebydd: David Dixon
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51772
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Clive Blockley
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51782
Derbyniwyd: 27/07/2012
Ymatebydd: James Broad
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51792
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Richard Cooke
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51802
Derbyniwyd: 27/07/2012
Ymatebydd: Chris Coombes
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51812
Derbyniwyd: 27/07/2012
Ymatebydd: Tessa Coombes
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51822
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Phil Green
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51832
Derbyniwyd: 27/07/2012
Ymatebydd: Mrs Gill Jaffray
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51842
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Ian Gold
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51852
Derbyniwyd: 27/07/2012
Ymatebydd: Mrs Sarah Baumfield
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51862
Derbyniwyd: 27/07/2012
Ymatebydd: Mrs Jenny Mann
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51872
Derbyniwyd: 27/07/2012
Ymatebydd: Karen King
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51882
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Myles Wilcox-Smith
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51892
Derbyniwyd: 27/07/2012
Ymatebydd: Mark Goosens
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51902
Derbyniwyd: 27/07/2012
Ymatebydd: Jane Woods-Scawen
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51912
Derbyniwyd: 27/07/2012
Ymatebydd: steven Mann
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51922
Derbyniwyd: 27/07/2012
Ymatebydd: Colin Cooper
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51932
Derbyniwyd: 27/07/2012
Ymatebydd: j freedman
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51942
Derbyniwyd: 27/07/2012
Ymatebydd: Mary Allanson
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51952
Derbyniwyd: 27/07/2012
Ymatebydd: Judith Bourne
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51962
Derbyniwyd: 27/07/2012
Ymatebydd: Mr John Bewick
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51972
Derbyniwyd: 27/07/2012
Ymatebydd: mrs susan sayer
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 51982
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Steve Dix
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 52002
Derbyniwyd: 27/07/2012
Ymatebydd: Andrew Mullen
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 52012
Derbyniwyd: 27/07/2012
Ymatebydd: Hugh Gilmore
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 52022
Derbyniwyd: 27/07/2012
Ymatebydd: Judith Gilmore
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:
Cefnogi
Preferred Options
ID sylw: 52032
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Ian Calderbank
Support PO18 - Flooding and Water
Standard Response Representation Attached. Text copied below:
Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council