BASE HEADER

2 The Local Plan and Consultation Process

Yn dangos sylwadau a ffurflenni 61 i 80 o 80

Gwrthwynebu

Revised Development Strategy

ID sylw: 59278

Derbyniwyd: 16/07/2013

Ymatebydd: Mr Andrew Copson

Crynodeb o'r Gynrychiolaeth:

Any current planning applications should be put on hold until a more reasonable, sensible, and practical scheme that has a viable traffic solution is established for the area.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59280

Derbyniwyd: 16/07/2013

Ymatebydd: Mrs Jan Copson

Crynodeb o'r Gynrychiolaeth:

Any current planning applications should be put on hold until a more reasonable, sensible, and practical scheme that has a viable traffic solution is established for the area.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59390

Derbyniwyd: 27/06/2013

Ymatebydd: Mr Stephen McFadden

Crynodeb o'r Gynrychiolaeth:

The consultation period has recently been extended for the Woodside Farm development in Whitnash. However, 3 other significant developments are proposed nearby: Hawkes Farm, North of Harbury Lane, Heathcote (Ref W/13/0607); South of Harbury Lane (ref W/13/0606); West of Europa Way (ref W/13/0603). Believes that local residents have not had long enough to digest what the implications of these might be, and would request that a similar extension of the consultation period is granted for these applications.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59419

Derbyniwyd: 23/07/2013

Ymatebydd: Mr John Evans

Crynodeb o'r Gynrychiolaeth:

It is also undemocratic as local people have previously made it very clear that building in this area (south of Warwick and Harbury Lane) is unacceptable.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59428

Derbyniwyd: 22/07/2013

Ymatebydd: Mrs Suzy McNamara

Crynodeb o'r Gynrychiolaeth:

A major concern is why before the local plan is agreed are the WDC looking at accepting other applications like wood farm and harbury gardens. These should not be accepted until the local plan is accepted after correct public consultation. WDC should stand up to national government during the appeal process if necessary.

"Back door" applications must be refused until this process is considered together.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59482

Derbyniwyd: 29/07/2013

Ymatebydd: Rachel Edwards

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59484

Derbyniwyd: 04/07/2013

Ymatebydd: Mr Stephen McFadden

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59486

Derbyniwyd: 12/07/2013

Ymatebydd: Carol Henderson

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59489

Derbyniwyd: 22/07/2013

Ymatebydd: Timothy & Di Griffiths

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.
Pushing these planning applications through before the consultation process is irresponsible and incompetent; and ultimately will lead to costing local tax payers more.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59863

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Trevor E Wood

Crynodeb o'r Gynrychiolaeth:

The Local Plan consulatation process is very complex and too difficult for the public to follow. The amount of documents to be completed on line is extremely difficult as one has to familiarise themselves with numerous documents before they can submit meaningful responses.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 59880

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Kevin Mitchell

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 59955

Derbyniwyd: 28/07/2013

Ymatebydd: mrs sharlene hayward

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60184

Derbyniwyd: 29/07/2013

Ymatebydd: Councillor Philip Morris

Crynodeb o'r Gynrychiolaeth:

There has been a lack of consultation with rural communities, which are quite separate from the main urban areas.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60187

Derbyniwyd: 29/07/2013

Ymatebydd: Lone Star Land LLP

Asiant : Alliance Environment & Planning Ltd

Crynodeb o'r Gynrychiolaeth:

It is noted that the consultation document does not cover the full range of topics that will be included in the Local Plan when it is complete and indeed does not cover all of the topics that were included in the Preferred Options consultation which took place in 2012.

Having reviewed the RDS the following observations are made.

Plan Period

Clarification is sought from the Council with regards to the proposed plan period as there appears to be conflicting time periods stated within the RDS, for example para 1.2 suggests a 15 year period and para 4.1 suggests the plan commencement and end dates of 2011 - 2029 which are some 18 years apart. Duty to Co-operate:

WDC has four neighbouring authorities, and the Council has not yet demonstrated evidence of collaborative working with those authorities. Collaboration with these authorities is considered to be critical given the current uncertainty over the level of housing provision required within neighbouring authority areas to meet their own assessed needs for both market and affordable housing.

Caution should therefore be taken by the Council until the findings of the new SHMA are reported as it may be the case that neighbouring authorities will call upon Warwick District Council to assist them with the delivery of their own assessed housing needs.

Atodiadau:

Cefnogi

Revised Development Strategy

ID sylw: 60228

Derbyniwyd: 27/07/2013

Ymatebydd: Gallagher Estates

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

The NPPF reflects the emphasis which the Government is placing on ensuring that the development the country needs is delivered and contains an additional test of soundness for Local Plans which reflects this, stating that a plan should be:

"Positively prepared based on a strategy which seeks to meet objectively assessed development and infrastructure requirements, including unmet requirements from neighbouring authorities where it is practical to do so consistently with the presumption in favour of sustainable development."

There is [therefore] an increased responsibility on the authority to ensure that the requirement for development is properly evidenced in a transparent and robust manner when making decisions about their strategy.

Very much support and endorse the approach of the District, as set out in paragraph 1.3 of the RDS, to ensure that there is a robust and up to date evidence base and, welcome the acknowledgement that there will be a need to take account of the as yet unavailable findings of the Joint Strategic Housing Market Assessment (JSHMA)

The paragraph 1.3 acknowledgements contained within the RDS are an encouraging response to the concerns previously made to the Preferred Options of May 2012. At that stage there appeared to be no means by which the Duty to Co-Operate could be satisfied which would undoubtedly have been an inadequate basis on which to allow the Plan to move forward.

Welcome the fact that Warwick District is now recognising its statutory obligations with regard to the Duty to Co-Operate with neighbouring authorities in the preparation of the Warwick Local plan in order to maximise its effectiveness with regard, in particular, to the strategic planning matter of housing provision.

The findings of the Inspector considering the Coventry Local Development Plan- Core Strategy (withdrawn in April 2013)were no doubt instructive in this regard. In short, he concluded that the Council had failed to meet the legal requirements of the Duty to Co-Operate.

Whilst the progress in seeking to meet the Duty to Co-Operate is encouraging it is also important to note that the District does have additional neighbouring authorities particularly Stratford upon Avon District and Solihull MBC.

This is pertinent as both Solihull and Stratford are, at present, progressing Local Plans that incorporate a level of new housing development which is significantly lower than their arising needs which could have implications for Warwick District.

Would stress that in addition to the Joint SHMA work currently underway, the Authority must also be in a position, on submission of the Plan, to be capable of demonstrating that they have met the Duty to Co-operate with both Stratford and Solihull.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60241

Derbyniwyd: 28/07/2013

Ymatebydd: Jenny Hornsby

Crynodeb o'r Gynrychiolaeth:

It is unacceptable that applications have been submitted and approved for land that is earmarked to be part of the Local Plan, before the Local Plan has been fully agreed. Such applications should not even be considered until such time as the Local Plan has been clarified and the public consultation completed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60245

Derbyniwyd: 25/08/2013

Ymatebydd: Mr Nigel Hamilton

Crynodeb o'r Gynrychiolaeth:

Recent Council presentations and response to questions from the public by WDC Officers was poor. WDC has chosen to ignore the views of the local population on the previous consultation in July 2012. Totally undermines the Government's stated principle of "Localism". The stated public position of the senior council officers and the executive that they "must" have far more housing than the current inhabitants of the District want in the local plan appears to directly contradict the Localism Act.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60258

Derbyniwyd: 26/07/2013

Ymatebydd: Mr Patrick Reddin

Crynodeb o'r Gynrychiolaeth:

Concerned to hear at the meeting that these plans had been pushed through by councillors who do not live in the area and that politics were possibly involved in the decision making?

Gwrthwynebu

Revised Development Strategy

ID sylw: 60343

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Peter Kerr

Crynodeb o'r Gynrychiolaeth:

Presentation by WDC personnel (15/7/13) was less than impressive, the acoustics were bad resulting in part of the presentation not being fully audible and the attitude seemed to be, "this is what you are going to get so you will have to put up with it". Certainly not a "consultation" process.

To gain the support and the trust of the residents of Warwick District more openness and consultation than in the past is now required.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63433

Derbyniwyd: 29/07/2013

Ymatebydd: Mr. Paul Davison

Crynodeb o'r Gynrychiolaeth:

-The historic towns of Warwick and Leamington should be cherished and treated to the most carefully considered planning procedures. Unfortunately, although town and country planning is the responsibility of the local district council which should base its decisions very much on the local situation, these days it appears that the planning proposals decided at a national level take priority over local needs and wishes leading to a loss of character.
-The proposals in the local plan indicate that any land not specified as green belt should be built on.

Atodiadau: