RDS7: The location of new employment land is as follows:

Yn dangos sylwadau a ffurflenni 1 i 21 o 21

Cefnogi

Revised Development Strategy

ID sylw: 53098

Derbyniwyd: 17/07/2013

Ymatebydd: Boston Fieldgate Property Consultants

Crynodeb o'r Gynrychiolaeth:

In my opinion as a property adviser the allocation should be increased to at least 10 ha and should not be exclusively office led and should included other uses within Class B subject to their compatibility with adjoining development and conditional upon high quality buildings being developed appropriate for their use and purpose.

Gwrthwynebu

Revised Development Strategy

ID sylw: 53112

Derbyniwyd: 17/07/2013

Ymatebydd: John Murphy

Crynodeb o'r Gynrychiolaeth:

Too much concentration south of Warwick/Leamington - 1/3 of the total provision or over half of the non-strategic allocation will be forced into the southern area - so will produce even more commuting and traffic problems

Gwrthwynebu

Revised Development Strategy

ID sylw: 53246

Derbyniwyd: 21/07/2013

Ymatebydd: Mr C Wood

Crynodeb o'r Gynrychiolaeth:

The land to the east of the Warwick Technology Park should not be considered. It is designated an Area of Restraint specifically to prevent what is being proposed. When the Technology Park was created it was on the condition that it would not spread east.

Gwrthwynebu

Revised Development Strategy

ID sylw: 53710

Derbyniwyd: 28/07/2013

Ymatebydd: Mrs Jean Drew

Crynodeb o'r Gynrychiolaeth:

As I believe there is no need for the development of homes in the area south of Warwick and Whitnash I think there is no need for new employment land in this area especially as Warwick District has low unemployment at only 1.7%.

Gwrthwynebu

Revised Development Strategy

ID sylw: 53779

Derbyniwyd: 28/07/2013

Ymatebydd: ed boyle

Crynodeb o'r Gynrychiolaeth:

Honiley airfield provides an exceptional employment opportunity. There are already 59 businesses located in a small part of the eastern area. It provides a far superior site for employment than the Gateway and will impose a far lesser burden on the public purse.

Gwrthwynebu

Revised Development Strategy

ID sylw: 54247

Derbyniwyd: 29/07/2013

Ymatebydd: Mrs J Mackenzie

Crynodeb o'r Gynrychiolaeth:

I object to any land at thickthorn being designated employment land . It has been demonstrated that there is over 20 years supply of sites already designated for this purpose in the area. WDC has granted permission for development at abbey park and stoneleigh park and both sites are struggling to find any occupants. Thickthorn is green belt and a need for employment land here cannot be demonstrated.

Gwrthwynebu

Revised Development Strategy

ID sylw: 54294

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Andrew Illsley

Crynodeb o'r Gynrychiolaeth:

Over estimated requirement.

Cefnogi

Revised Development Strategy

ID sylw: 54341

Derbyniwyd: 29/07/2013

Ymatebydd: Midland Red (South) Ltd. dba Stagecoach Midlands

Crynodeb o'r Gynrychiolaeth:

We support both strategic allocations.

We would prefer that the extension of Warwick Tech Park takes place to the north of Gallows Hill where opportunity to address the challenges and opportunities created by current car dependency can be better realised.

Gwrthwynebu

Revised Development Strategy

ID sylw: 54908

Derbyniwyd: 29/07/2013

Ymatebydd: E and D Berrill

Crynodeb o'r Gynrychiolaeth:

The Gateway is unsustainable and inappropriate development of the Green Belt with no very special circumstances. We agree with the BPC's request to remove references to the Gateway and associated projections from the Local Plan.

Gwrthwynebu

Revised Development Strategy

ID sylw: 56242

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Matt Western

Crynodeb o'r Gynrychiolaeth:

Has a number of concerns regarding the Economy and Employment Land:
* Cannot see where in the document it speaks of the additional employment lands other than at the Gateway site?
* A reduction in employment land on industrial estates in Sydenham, Cape Road, Montague and Common Lane would be to the detriment of low skilled work forces throughout the area. Currently such workers are able to walk / cycle to work. This will not be the case in the future as these sites are sold off for housing.
* Agrees with statement " a need to provide new employment land in and around the District's main towns to meet local needs and encourage the creation of new jobs".but has serious reservations about the viability and robustness of the Gateway project to deliver the proposed quantity and quality of employment.
* the notion of a business park by the airport would suggest that it is really a giant logistics park by stealth. The former Ryton car plant site is a ready-made brownfield location for such business.
* Does not see how the expansion of the Warwick Technology Park will help low-skilled workers find jobs
* the document details the need to "support the rural economy"; this is really important but only touched on. The entire viability of villages is threatened in future with the withdrawal of services from them (the closure of post offices / pubs, small village stores, even primary schools etc..)
* the rural economy is very fragile and villages need greater support if they are to remain viable. Rural bus services will become more and more threatened unless the villages served have sufficient mass.

Cefnogi

Revised Development Strategy

ID sylw: 56340

Derbyniwyd: 29/07/2013

Ymatebydd: Stagecoach

Crynodeb o'r Gynrychiolaeth:

Supports the provision of employment land at the western end of Thickthorn, which could be served by existing company services; and also allocation adjoining Warwick Technology Park (WTP).

The augmentation of employment at WTP could help create greater critical mass of demand for existing and future augmented services here, as well as reducing the average distances residents in the locality will need to travel to work from the new development overall. Shorter travel to work distances give scope for more sustainable modes, including bus services, to offer attractive options compared with personal car use.

It should be possible to address the current unsatisfactory bus circulation and stopping arrangements within the existing Technology Park site, and the problems associated with on-carriageway and other inappropriate parking. Rigorous Travel Planning formulation and delivery should accompany proposals for this location to avoid exacerbating existing car-dependency and congestion.

Gwrthwynebu

Revised Development Strategy

ID sylw: 56572

Derbyniwyd: 29/07/2013

Ymatebydd: Warwickshire County Council Physical Assets Business Unit

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

Strongly objects to the reference at paragraph 4.6.1 of the Revised Development Strategy. It is considered that WDC's strategy for the selection of sites for employment does not properly take into account the following factors, which are considered to be key for sustainable development:

Market Signals:

a)The employment land take-up across the District has been slow.
The slow and apparently decreasing rate of completions should be taken into account when determining where future employment allocations should be best located and when they should be phased;

b) There is an increasing demand for residential land. To meet this demand and ensure that the residential development is phased appropriately, the most sequentially preferable sites should be
given priority for residential use.

Employment Land Phasing:

The allocation of additional employment land in the early phases of the Plan may prejudice the completion of other existing sites (Tournament Fields) and the delivery of proposed strategic employment sites (Coventry Gateway).

Sequential Approach:

The WCC land at Europa Way represents the most sequentially preferable site for residential development as it comprises part of the Myton Garden suburb, which adjoins the existing settlement boundary.

Based on the difficulties identified by Gallagher Estates in marketing their site and the emerging pressures for residential land, it is likely that the approach to employment land allocations being promoted by WDC would result in a substantial proportion of the WCC land remaining undeveloped for a significant period of time if it was allocated for employment use.

This would leave a significant gap in the urban extension to the Warwick/Leamington urban area for a significant length of time , resulting in unsustainable development.

Although the proposed allocation for employment land and a park and ride facility would only affect approximately 50% of the WCC land, lack of development of this gateway site could have serious implications for the wider area to the south of Warwick/Leamington.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 56598

Derbyniwyd: 29/07/2013

Ymatebydd: Canon David Tilley

Crynodeb o'r Gynrychiolaeth:

The erosion of Green Belt that would be occasioned by Gateway development does not seem to be justified by exceptional circumstances. The case has not been made for the necessity of a distribution centre of the size proposed. It is important that Green Belt be preserved, especially round a village so close to Coventry city.

Gwrthwynebu

Revised Development Strategy

ID sylw: 56649

Derbyniwyd: 29/07/2013

Ymatebydd: One Hundred Percent Properties

Asiant : Barton Willmore

Crynodeb o'r Gynrychiolaeth:

Welcomes the recognition in paragraph 4.5.11 that the sub-region has a particular strength in the automotive / vehicle manufacturing and advanced manufacturing and engineering sectors

The former Honiley Airfield plays a key role in delivering facilities for these uses within Warwick District.

In this respect, consider that it is key that the Council follow through on their proposal in the previous version the New Local Plan, at Policy PO8, to develop "a policy framework to support appropriate development at identified Major Developed Sites in the Green Belt which may include site specific policies for Stoneleigh Park, the University of Warwick, Coventry Airport and the Former Honiley Airfield".

A site specific policy for the former Honiley Airfield would support sub-regional objectives relating to economic development, in line with the Coventry and Warwickshire LEP Strategy 5 Year plan (2011-2016).

In addition to the clear economic benefits that could be delivered from future development at the site, attracting new investment would also result in a number of on-site environmental improvements, including re-laying the test track with a noise reducing surface and providing noise-attenuating bunds.

This would ensure future development is sympathetic to the Green Belt designation and reduce the harm to the amenity of surrounding residents.

In addition, whilst we support the Council's intention to continue to identify the former Honiley Airfield as an MDS, we consider that the development of a site specific policy should be accompanied by a review of the MDS designation.

As a minimum, the MDS should be extended so that it is, at the very least, consistent with the Fulcrum planning permission which approves the principle of development in an area of woodland currently excluded from the MDS.

It would be more appropriate, however, to extend the MDS designation to also cover the test track, conscious of the extensive areas of hardstanding associated with it, its previously developed character, and recognising that fact that it has an established pattern of continued use
.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 57928

Derbyniwyd: 05/07/2013

Ymatebydd: Parklands Consortium Ltd

Crynodeb o'r Gynrychiolaeth:

Object to the inclusion of the Gateway site within the proposals as this inappropriate development in the green belt and is not consistent with the NPPF.
The policy of supporting a sub-regional plan to create more employment is contrary to the NPPF; the Gateway will lead to displacement of jobs from Coventry - negative impact on regeneration zone. Very few of the jobs created will be new and many will be displaced from Warwick and Leamington.
The Gateway proposals do not represent very special circumstances as there are alternative sites. The RSS is no longer relevant and cannot be used as a basis for justifying the Gateway.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 57945

Derbyniwyd: 25/07/2013

Ymatebydd: Mr M S Anderson

Crynodeb o'r Gynrychiolaeth:

Object to proposals for the development of the Gateway

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 59121

Derbyniwyd: 26/07/2013

Ymatebydd: Ms Patricia Campbell

Crynodeb o'r Gynrychiolaeth:

I object strongly to The Gateway and the totally unsuitable development of Green Belt land. In no respect should this project be given credence in the light of unfounded promises of boosting employment numbers and eroding such large areas and blighting the land. Please take on board the BPC concerns and see less commerce £ signs and a more balanced view of the benefit of such a scheme. In light of so many industrial units being empty in and around Coventry and businesses crumbling daily, it seems preposterous for more green belt land to be taken forever and lives and homes ruined.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59173

Derbyniwyd: 28/07/2013

Ymatebydd: Ms Veronica Power

Crynodeb o'r Gynrychiolaeth:

Inappropriate development for Green Belt Land and its environmental and community impacts.

The Gateway scheme does not enhance or improve the area and would have far-reaching negative impacts on local communities and the environment. The proposal is deeply flawed in content and sustainability. THis proprosal should be withdrawn.

Both schemes unsustainable and the Green Belt should be protected.

Gwrthwynebu

Revised Development Strategy

ID sylw: 59301

Derbyniwyd: 23/07/2013

Ymatebydd: Rod Wheat

Crynodeb o'r Gynrychiolaeth:

Unacceptable to use the unsubstantiated deficit to justify developments in RDS7 (section 4.6) of 14.5ha of new employment land in the green-belt, being Thickthorn (8ha) and a chunk of 'the employment site of sub-regional significance' (6.5ha) this being part of the 'coalescence' that is the Gateway of course (itself being a part of the abolished RSS RIS).

Furthermore, the Thickthorn housing development (and its employment allocation) will of course dramatically reduce the already vanishing separation between Kenilworth and Leamington.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60025

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Graham Pyatt

Crynodeb o'r Gynrychiolaeth:

The Gateway proposals seem to offr very little value to the District as there are very low levle of unemployment in the District. The benefits of the Gateway will be felt elsewhere. In addtion the Gateway might not happen as is not in the Council's control and even if it does, it is unlikely to generate the number of jobs claimed for it.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60416

Derbyniwyd: 28/07/2013

Ymatebydd: Christine Miles

Crynodeb o'r Gynrychiolaeth:

Doesn't understand why that area of land at Thickthorn would be designated for employment use, when there is no history of employment use in that part of Kenilworth, and there would not appear to be a demand for employment land in Kenilworth.