BASE HEADER
Barford
Gwrthwynebu
Revised Development Strategy
ID sylw: 57713
Derbyniwyd: 18/07/2013
Ymatebydd: Mr Robert Miatt
Local road infrastructure cannot cope with this additional volume of cars.
Local facilities (school, nursery etc) cannot cope with this influx of people.
Church street is already a rat run between leamington Spa and Warwick and the A429 / M40. Adding additional housing will only make this worse.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57747
Derbyniwyd: 29/07/2013
Ymatebydd: Mrs Suzanne Smith
Thre are already enough houses in an around thie village of Barford and it is considered that there is no need for additional homes at this location.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57749
Derbyniwyd: 29/07/2013
Ymatebydd: Mr Martin Welch
Barford is a small village community which will be destroyed by development of the scale proposed in the RDS. There are many urban locations with better infrastructure and characteristics more suited to supporting this identified housing growth. Do not turn the whole of this green and pleasant land into a housing estate.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57751
Derbyniwyd: 31/07/2013
Ymatebydd: Mrs Rita Hunt
Futher developemnt of 70 plus houses in Barford is far too many and it must be remembered that the school could not accomodate many more children. The one excellent (but small shop) would not be able to cope along with the local GP services. The Barford By-pass has been good for Barford but there are still big problems associated with rat-running traffic to the business parks south of Leamington , as a consequence the highway safety and crossing of roads can be problemmatic especially in High Street / Church Street.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57754
Derbyniwyd: 29/07/2013
Ymatebydd: Mrs Daphne Smith
Barford school is already full.
No close Doctor's services.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57758
Derbyniwyd: 29/07/2013
Ymatebydd: Mrs Janet Lemmon
We cannot take anymore houses our school is full, the traffic is horrendous already and we don't need any more mass building schemes in Barford.
Access onto the Wellesbourne road will be chaotic in the mornings and the bus stop (which awas to be moved) will block vision coming out of Westham Lane.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57824
Derbyniwyd: 24/07/2013
Ymatebydd: Mark Williams
Proposed 70-90 houses in Barford would have a negative impact on Barford St. Peter's School which would not be able to accommodate more school children therefore proposal is not sustainable.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57853
Derbyniwyd: 29/07/2013
Ymatebydd: Mr Anthony Baker
Objects to development in Barford, the village has slowly developed over hundreds of years. 90 further homes would completely change the area and represent a 30% increase in the size of the village. Despite the bypass traffic uses Church Street and High Street as a short cut to the schools and industrial estates of Leamington. There is gridlock in the village, danger and pollution to the area locating the school, shop and green. The Barford bridge will not be able to take any further traffic without major costly infrastructure work. There is little work in Barford and there should be no desire to place more offices or industrial units in any village. The electricity supply and waste water provision is not efficient, infrastructure cannot cope with additional homes.
Gwrthwynebu
Revised Development Strategy
ID sylw: 57854
Derbyniwyd: 29/07/2013
Ymatebydd: Mrs Miranda Baker
Barford Village is the product of many centuries and is a diverse range of house styles and architecture that make up its quality / complimenting the rural area.
A proposal for 90 new homes in the village would completely upset the current blend and balance (representing a 30% increase in the size of the village , causing irrepairable damage).
The current road network is being usesd irresponsibly by commuter traffic trying to find more direct routes to Warwick and Leamington this is causing danger to the public in the village. The current infrastructure could not cope with any additional growth - there are already problems associated with power supply and waste water provision.
Gwrthwynebu
Revised Development Strategy
ID sylw: 59265
Derbyniwyd: 16/07/2013
Ymatebydd: Mr Mark Edwards
* The proposed requirement to provide 70-90 new dwellings during the Plan period, given the Barford's status as a "Secondary Service Village", would have a negative impact on the capacity of Barford St. Peter's School which does not have the scope for further extension, and is not sustainable.
Gwrthwynebu
Revised Development Strategy
ID sylw: 59476
Derbyniwyd: 29/07/2013
Ymatebydd: Mrs Anne Lloyd
During rush hour Barford is being used as a 'rat -run' to gain quicker access to Warwick and Leamington. This position will be made worse by additional housing - and the additional cars that will not be able to navigate easily as the roads are not capable of supporting them.
Gwrthwynebu
Revised Development Strategy
ID sylw: 59861
Derbyniwyd: 29/07/2013
Ymatebydd: Mr Martin Lusby
The villages have already been blighted by excessive development. In Barford a number of area have properties crammed into a small space. These have a detrimental effect on the village, while at the same time the council does not rectify a visually unattractive property in a central location.
Gwrthwynebu
Revised Development Strategy
ID sylw: 60135
Derbyniwyd: 29/07/2013
Ymatebydd: Mr William Smith
We don't need anymore houses in the village.