BASE HEADER

Revised Development Strategy

Yn dangos sylwadau a ffurflenni 181 i 210 o 214

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63609

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Stacey Ellis

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63619

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Vincent Spiers

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63621

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Vincent Spiers

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63631

Derbyniwyd: 22/01/2014

Ymatebydd: Miss Holly Stevens

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63633

Derbyniwyd: 22/01/2014

Ymatebydd: Miss Holly Stevens

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63643

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Daniel Hayward

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63645

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Daniel Hayward

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63655

Derbyniwyd: 22/01/2014

Ymatebydd: Ms Deborah Wilson

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63657

Derbyniwyd: 22/01/2014

Ymatebydd: Ms Deborah Wilson

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63667

Derbyniwyd: 22/01/2014

Ymatebydd: Keri Hinchley

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63669

Derbyniwyd: 22/01/2014

Ymatebydd: Keri Hinchley

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63679

Derbyniwyd: 22/01/2014

Ymatebydd: Mrs Karen Dawson

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63681

Derbyniwyd: 22/01/2014

Ymatebydd: Mrs Karen Dawson

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63691

Derbyniwyd: 22/01/2014

Ymatebydd: Mrs Angela Marion Ellis

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63693

Derbyniwyd: 22/01/2014

Ymatebydd: Mrs Angela Marion Ellis

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63703

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Peter John Ellis

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63705

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Peter John Ellis

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63715

Derbyniwyd: 22/01/2014

Ymatebydd: mrs jane hayward

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63717

Derbyniwyd: 22/01/2014

Ymatebydd: mrs jane hayward

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63727

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Richard HAYWARD

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63729

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Richard HAYWARD

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63739

Derbyniwyd: 22/01/2014

Ymatebydd: Jamie Hinchley

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63741

Derbyniwyd: 22/01/2014

Ymatebydd: Jamie Hinchley

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63751

Derbyniwyd: 22/01/2014

Ymatebydd: Mrs Sharon Stevens

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63753

Derbyniwyd: 22/01/2014

Ymatebydd: Mrs Sharon Stevens

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63763

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Denis Hinchley

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63765

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Denis Hinchley

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63775

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Carl Stevens

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63777

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Carl Stevens

Crynodeb o'r Gynrychiolaeth:

-Hampton-on-the-Hill adjoins Hampton Magna and utilises its amenities (NPPF 2012 Paragraph 5; WDC Local Plan Page 9). It is not clear why there is no option to development any housing at Hampton-on-the-Hill.

-Some proportionate additional expansion could be considered at Hampton-on-the-Hill. If it is not considered appropriate then reasons should be fully explained.

-Proposed level of growth in Hampton Magma is unsustainable with infrastructure and transport unable to cope. Hampton Magna has expanded in past years and there have been many developments in the surrounding district which impact on the sustainability of the area.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63787

Derbyniwyd: 22/01/2014

Ymatebydd: Mr Stephen Wilson

Crynodeb o'r Gynrychiolaeth:

-The outcome of the Gateway and JSHMA may change the housing needs in the district.
-The importance of agreeing any development with the Parish Council is highlighted in the document. Budbrooke PC has been communicating their objection since the start of the process and they have not yet been listened to.
-It is unfair that villages are having housing built on Green Belt land when other potential development areas such as Milverton have been removed due to Green Belt issues.
-Concerned that more houses are proposed on Green Belt compared to non-Green Belt villages.

Atodiadau: