Whilst it is important that additional housing is directed towards the villages it is also important that this does not cause unacceptable harm to the environment (be that landscape, flooding, Green Belt impact etc). We therefore support the Council's strategy of providing only as much housing within and adjoining the villages as can be comfortably accommodated.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 60923

Derbyniwyd: 16/01/2014

Ymatebydd: Sworders

Crynodeb o'r Gynrychiolaeth:

We appreciate that the detailed site assessment work has resulted in a decrease in the total number of village housing due to environmental and access restrictions, against the backdrop of a likely increase in the district housing requirement as evidenced by the recently published Coventry & Warwickshire joint Strategic Housing Market Assessment (SHMA), the council should approach this reduction with caution.

Sites must be deliverable therefore access restrictions are important considerations and can be an absolute bar to development, environmental constraints are more objective and must be balanced against the requirement to meet the full needs of a growing population.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61080

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Jacqueline Crampton

Crynodeb o'r Gynrychiolaeth:

A general comment that the housing sites seem to have been whittled down on environmental grounds where amelioration by planting or lower density of development could have provided satisfactory development.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61222

Derbyniwyd: 20/01/2014

Ymatebydd: Miss katie bould

Crynodeb o'r Gynrychiolaeth:

Traffic - redirect the traffic away from red lane and towards westwood heath direction closer to motorway links and train networks in Tile Hill.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61227

Derbyniwyd: 20/01/2014

Ymatebydd: Bloor Homes Midlands

Asiant : Marrons Planning

Crynodeb o'r Gynrychiolaeth:

-The statement within paragraph 4.10 of this consultation report that the lower figure now proposed of 835 dwellings reflects environmental and access restrictions will need to be robustly demonstrated on a site by site basis if this is to be taken forward into the Draft Local Plan and found 'sound'.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61523

Derbyniwyd: 20/01/2014

Ymatebydd: Major Bruce Prout-Richardson

Crynodeb o'r Gynrychiolaeth:

-Infrastructure requirements, including new roads, schools and other amenities should be prioritized rather than 'carefully' considered.
-As traffic will increase, some roads will have to be widened and properly haunched.
-Additionally, potholes need to be repaired properly and quickly.
-Traffic increase will particularly impact on Hampton-on-the-hill.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61877

Derbyniwyd: 17/01/2014

Ymatebydd: Miss F Coogan

Crynodeb o'r Gynrychiolaeth:

-Parish Councillors were not consulted about the preferred option for Radford Semele. They have proposed alternative sites on the Southam Road which developers are already keen to use. Ignoring this and overriding their decision is unreasonable, undemocratic and verging on illegal.
-There has been no proper consultation of either the Parish Council or the residents. Most heard about the proposals from fellow residents and with very little time remaining in which to make their protest.
-Council representatives were unable to answer relevant questions at local meetings and showed a lack of respect for taxpayers in their verbal response to objections.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61930

Derbyniwyd: 18/01/2014

Ymatebydd: Roger Mills

Crynodeb o'r Gynrychiolaeth:

-If the consultation is to have any credibility at all, WDC will need to show clear examples of changes which have been made to the plan as a result of the views expressed by residents.
-Planners' opinions should be independently tested as the planning department's site conclusions are too "blinkered".

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62089

Derbyniwyd: 16/01/2014

Ymatebydd: Peter Stocker

Crynodeb o'r Gynrychiolaeth:

-How is it that development plans come to light, after the land at Radford Semele Site 1 has been sold to Gladman for building? Gladman would not have bought this land unless they were sure that they were assured of planning permission.

-This whole exercise of so called public involvement is smoke and mirrors and is just a cosmetic exercise which will not affect in any way the final outcome. Building will happen.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62162

Derbyniwyd: 20/01/2014

Ymatebydd: Mr Ian Green

Crynodeb o'r Gynrychiolaeth:

-Contrary to the majority of residents in Burton Green requesting a reduction in the number of houses, this has increased from 30/80 to now 70/90?

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 63160

Derbyniwyd: 15/01/2014

Ymatebydd: West Midlands HARP Planning Consortium

Asiant : Tetlow King Planning Ltd.

Crynodeb o'r Gynrychiolaeth:

-The village/parish housing needs surveys reference in paragraph 4.6 will also inform this evidence base and we are pleased these are being updated.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63196

Derbyniwyd: 17/01/2014

Ymatebydd: Sharba Homes

Asiant : PJPlanning

Crynodeb o'r Gynrychiolaeth:

-Paragraph 4.6 ignores the view that the amount of housing proposed in some of the villages is insufficient when compared to local needs and assumes that the villages should be limited to local needs rather than providing beyond that for the Districts growth needs as sustainable settlements capable of growth.

-The point made in previous consultation responses are ignored that a sustainability assessment that ignores Green Belt as a negative constraint, as with the local planning authority's assessment is an entirely unsound basis for making locational choices for new development. This approach flies in the face of longstanding government policy.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63199

Derbyniwyd: 17/01/2014

Ymatebydd: Sharba Homes

Asiant : PJPlanning

Crynodeb o'r Gynrychiolaeth:

-There is an issue about the partial two responses in Paragraph 4.6 to those people wishing to see the allocations reduced. A third equally valid point points towards increased rather than reduced allocations - surveys carried out represent a minimum not a maximum identified need. At our recent appeal in Barford, the inspector did indeed clarify this was the case.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 63224

Derbyniwyd: 08/01/2014

Ymatebydd: Mrs E Brown

Asiant : Stansgate Planning

Crynodeb o'r Gynrychiolaeth:

-Whilst it is important that additional housing is directed towards the villages it is also important that this does not cause unacceptable harm to the environment (be that landscape, flooding, Green belt impact etc.). We therefore support the Council's strategy of providing only as much housing within and adjoining the villages as can be comfortably accommodated.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63333

Derbyniwyd: 23/01/2014

Ymatebydd: Shaun & Ann Pitt

Crynodeb o'r Gynrychiolaeth:

The Plan refers to concerns about the impact of developments on local infrastructure but no practical proposals to resolve these issues are identified. This increases the likelihood of development where local medical and dental facilities become overwhelmed and wholly inadequate (such as in Balsall Common a few years ago).