BASE HEADER
Summary of Findings
Cefnogi
Village Housing Options and Settlement Boundaries
ID sylw: 60924
Derbyniwyd: 16/01/2014
Ymatebydd: Sworders
Baginton was identified as a Primary Service Village with services and facilities suitable to accommodate 70-90 dwellings under the Draft Settlement Hierarchy Report in May 2013 this has been reduced to only 35 dwellings. The density proposed on the preferred site is also below the full capacity as a result of the need for a high level of environmental screening. Whilst this may be necessary to make development of the site acceptable, it should be considered in light of the likely increase in the District housing requirement as demonstrated by the emerging evidence base.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 61224
Derbyniwyd: 20/01/2014
Ymatebydd: Miss katie bould
Village Centre - creating and connecting this - the village by nature is sprawling and not sure that locating development preference of site 1, is necessary for village centre, by nature of the occupants and the community it is a village from Red Lane to Hodgetts Lane and the outer boundaries of Burton Green
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 61249
Derbyniwyd: 20/01/2014
Ymatebydd: Mrs Suzanne Stannard
The proposals for Cubbington do not seem to have taken into account the impact of HS2 on residents living to the East of Coventry Road. we are already highly likely to suffer noise and environmental pollution as a results of the construction and running of the railway. Construction on prosed site 2 in Cubbington would add to the noise and would prevent quiet enjoyment of our homes even further, being sadnwiched between HS2 and a new estate which would entirely change the character of our immediate locale.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 61364
Derbyniwyd: 20/01/2014
Ymatebydd: Mr D. A. Rayney
The preferred site option is possibly the site most affected by HS2 of all. The site is adjacent to the proposed line of track and will be opposite the point at which site construction traffic will be at its heaviest, it will also be the point at which once complete will be the marshalling point for all maintenance traffic and it will be the site most affected by noise as it is opposite the proposed site of the southern portal to the cut and cover tunnel and will be subject to severe "startle effect" as trains come through the tunnel.
Cefnogi
Village Housing Options and Settlement Boundaries
ID sylw: 61864
Derbyniwyd: 20/01/2014
Ymatebydd: Bishop's Tachbrook Parish Council
-In agreement with the Overview of Findings relating to Bishop's Tachbrook on Table 3 on page 27 of the village housing options paper.
Bishops Tachbrook Parish Council (BTPC) wishes to make the following...
Cefnogi
Village Housing Options and Settlement Boundaries
ID sylw: 63021
Derbyniwyd: 20/01/2014
Ymatebydd: The Trustees of Sir Thomas White's Charity
Asiant : Keyhaven Consulting Limited
The data gathering and analysis undertaken by the District Council has fully justified the selection of Cubbington as one of the most sustainable villages to accommodate additional housing. As is pointed out in paragraph 5.8 of the current Village Housing Options document, Table 3 attempts to summarise some of the key findings from the technical studies and site evaluation matrix as they relate to individual settlements. In Cubbington, table 3 says that the preferred option(s) focus on minimising landscape impact and regenerating a small corner of the settlement edge, subject to suitable site screening and relocation of the existing allotments.
see attached