PO3 Criteria for assessing sites

Yn dangos sylwadau a ffurflenni 1 i 6 o 6

Gwrthwynebu

Preferred Options for Sites

ID sylw: 63941

Derbyniwyd: 25/04/2014

Ymatebydd: John Murphy

Crynodeb o'r Gynrychiolaeth:

Too much attention has been paid to the Greenbelt paradigm - given that G&T need is seen to be exceptional enough to trigger POSITIVE DISCRIMINATION in planning it should also be exceptional enough to more imaginatively explore options within the Greenbelt.

Gwrthwynebu

Preferred Options for Sites

ID sylw: 64024

Derbyniwyd: 29/04/2014

Ymatebydd: Miss Amanda FAWCETT

Crynodeb o'r Gynrychiolaeth:

There is no clear evidence that criteria are weighted according to their importance - eg the Greenbelt seems to be over-dominating in making decisions, as is access to major roads. More attention should be paid to impact on landscape, impact on agricultural economies and the safety for pedestrian access to and from the sites.

Sylw

Preferred Options for Sites

ID sylw: 64083

Derbyniwyd: 02/05/2014

Ymatebydd: Stratford-on-Avon District Council

Crynodeb o'r Gynrychiolaeth:

Policy PO3 should be amended to recognise the need to consider the potential for cumulative effects on the settled community when determining future planning applications.

Sylw

Preferred Options for Sites

ID sylw: 64234

Derbyniwyd: 06/05/2014

Ymatebydd: graham leeke

Crynodeb o'r Gynrychiolaeth:

Sites to be limited to between 5 and 7 pitches - original government advice was 5 to 15 pitches per site, but in para 2.1.2 the report states that "advice has been amended and the lower end of this scale is now recommended". However the Preferred Options ignores this policy by listing 13 of the 15 "preferred"sites to take 15 pitches

Sylw

Preferred Options for Sites

ID sylw: 64241

Derbyniwyd: 06/05/2014

Ymatebydd: graham leeke

Crynodeb o'r Gynrychiolaeth:

It has become clear through the consultation period that each pitch on a designated site should be sufficient to allow for at least 2 caravans, parking and turning space for several vehicles and outside washing /toilet facilities. The area quoted is 500 sq. m.per pitch. In terms of this space requirement and the noise and activity that will arise, it is understandable that the recommendation is for small sites. The target should therefore be to select sites for 5 -7 pitches rather than 10 to 15

Gwrthwynebu

Preferred Options for Sites

ID sylw: 64943

Derbyniwyd: 02/05/2014

Ymatebydd: Barwood Strategic Land II Limited

Asiant : HOW Planning LLP

Crynodeb o'r Gynrychiolaeth:

This policy requires sites to be deliverable and available yet sites GT02, GT05, GT06, GT12 and GTalt12 will all require CPOs and so do not meet the policy requirement. There is no indication of the relative weight to be placed on each criteria but it is not rational to identify sites as Preferred or Alternative if CPO powers are required. As CPO powers must be seen as a last resort, the Council must be able to demonstrate that all other options have been considered. It is clear that the site selection process is flawed and has not been adequately evidenced or explained, which will undermine the Council's case. The time and costs involved in the CPO process mean that there is no guarantee that the sites can be delivered in a reasonable timescale or at all and therefore cannot be considered as deliverable. This in turn makes the Plan unsound.

Atodiadau: