BASE HEADER
Hampton Magna
Gwrthwynebu
Publication Draft
ID sylw: 64524
Derbyniwyd: 26/05/2014
Ymatebydd: Mr Richard Thwaites
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
Previously developed land should be allocated first.
The Maple Lodge site is approx 25% brown field.
Previously developed land should be allocated first.
The Maple Lodge site is approx 25% brown field.
Gwrthwynebu
Publication Draft
ID sylw: 64534
Derbyniwyd: 26/05/2014
Ymatebydd: Mr Richard Thwaites
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
Transport. The preferred option for development within Hampton Magna routes all traffic through existing, inadequate estate roads. This causes safety concerns, noise, vibration and congestion issues.
The site also overlooks the A46/M40 road junction which is an area with existing air quality issues.
100 new homes in this site will be affected by the noise and poor air quality already generated by the adjacent trunk routes and will only worsen the situation.
The Maple Lodge site is on the opposite side of the village, hidden from, and unaffected by the pollution effects of, the trunk roads.
Transport. The preferred option for development within Hampton Magna routes all traffic through existing, inadequate estate roads. This causes safety concerns, noise, vibration and congestion issues.
The site also overlooks the A46/M40 road junction which is an area with existing air quality issues.
100 new homes in this site will be affected by the noise and poor air quality already generated by the adjacent trunk routes and will only worsen the situation.
The Maple Lodge site is on the opposite side of the village, hidden from, and unaffected by the pollution effects of, the trunk roads.
Gwrthwynebu
Publication Draft
ID sylw: 66020
Derbyniwyd: 27/06/2014
Ymatebydd: Centaur Homes
Asiant : McLoughlin Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
Para 1.36 The objection site was put forward and considered as part of this previous exercise.It was assessed as being capable of delivering 25 dwellings. However, it was excluded due to the requirement for a significant amount of site screening and softening of the development edge. As part of the assessment, all of the sites in Hampton Magna have been noted with the same constraint, including the allocated site. Only one site from this consultation has been carried forward and shown as an allocation within the Local Plan, Land South of Arras Boulevard.
See attachment
Gwrthwynebu
Publication Draft
ID sylw: 66446
Derbyniwyd: 26/06/2014
Ymatebydd: Mr William Campbell
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
because it is not:
Positively Prepared because it fails to properly assess Transport access to and from Budbrooke village and properly assess electricity, drainage sewerage infrastructure at Hampton Magna.
Not Justified because it does not properly take account evidence Budbrooke School does not have sufficient capacity to cope with additional houses.
Not Effecive because it does not deliver sustainable development in respect of transport access to and from Budbrooke village or electricity, drainage and sewerage infrastructure at Hampton Magna.
The Local Plan is not Legally Compliant because it makes no provision for self build housing required by NPPF
because it is not:
Positively Prepared because it fails to properly assess Transport access to and from Budbrooke village and properly assess electricity, drainage sewerage infrastructure at Hampton Magna.
Not Justified because it does not properly take account evidence Budbrooke School does not have sufficient capacity to cope with additional houses.
Not Effecive because it does not deliver sustainable development in respect of transport access to and from Budbrooke village or electricity, drainage and sewerage infrastructure at Hampton Magna.