Yn dangos sylwadau a ffurflenni 1 i 2 o 2

Gwrthwynebu

Local Plan Main Modifications 2017

ID sylw: 70531

Derbyniwyd: 05/05/2017

Ymatebydd: Mrs J Mackenzie

Crynodeb o'r Gynrychiolaeth:

The requirement to provide fibre optic capability should not be weakened. Sites must provide the infrastructure for current or future connection to the fibre optic technology available in that area

Testun llawn:

The requirement to provide fibre optic capability should not be weakened. Sites must provide the infrastructure for current or future connection to the fibre optic technology available in that area

Gwrthwynebu

Local Plan Main Modifications 2017

ID sylw: 70551

Derbyniwyd: 05/05/2017

Ymatebydd: Stoneleigh & Ashow Parish Council

Crynodeb o'r Gynrychiolaeth:

This must be mandatory. New developments must reflect and allow for modern technology and should be fibre optic ready

Testun llawn:

This must be mandatory. New developments must reflect and allow for modern technology and should be fibre optic ready