BASE HEADER

Net Zero Carbon Development Plan Document - Regulation 19

Chwilio sylwadau

Canlyniadau chwilio Warwick District Labour Party

Chwilio o’r newydd Chwilio o’r newydd

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

1 The Local Context

ID sylw: 72177

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Set specific and more ambitious emission standards

Specify BREEAM where appropriate (and another standard or standards where not) and and by category at maximum energy credits.

WDC to be explicit in leading by example

Testun llawn:

1.1.2 Set specific and ambitious maximum carbon emission standards. Can we adopt specific carbon emission targets in kwhr/m2/yr (not just percentages) as is widely recommended? And make the energy efficiency first principle first and more strongly - the cheapest energy is the energy we do not use.
Where in the document do we specify BREEAM for all developments, domestic and non-domestic now that CC3 is being superseded? Or does BREEAM apply only to non-residential buildings - in which case what standard for residential is being specified?
Each BREEAM standard needs to be specifically set by category and date and at maximum energy credits NOT very good to eliminate any non carbon emission/energy loopholes being exploited.
1.1.3 WDC as building and landowner should already be leading more strongly by example, by applying the proposed DPD standards - or better - in all projects since the CEAP was adopted, not waiting for formal DPD adoption; for example in Kenilworth Leisure, Spencer Yard and any others from WDC or partners in the pipeline.

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

1.2 About Warwick District

ID sylw: 72178

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

The role of the District in generating inward and outward flows of commuter traffic (principally to/from Coventry and Birmingham) should be highlighted. To minimise carbon emissions from current and future traffic flows the DPD should explicitly favour new development with minimum dwelling densities (NPPF paras 124/5) especially along public transport routes; and co-located as far as practical with planned employment locations (both within and outside the District), to encourage shorter journeys and greater use of active transport

Testun llawn:

The role of the District in generating inward and outward flows of commuter traffic (principally to/from Coventry and Birmingham) should be highlighted. To minimise carbon emissions from current and future traffic flows the DPD should explicitly favour new development with minimum dwelling densities (NPPF paras 124/5) especially along public transport routes; and co-located as far as practical with planned employment locations (both within and outside the District), to encourage shorter journeys and greater use of active transport

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

1.1 Warwick District Council's Climate Change Commitments

ID sylw: 72179

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

More specific and ambitious energy targets

Clarify and maximise use of BREEAM standards where applicable and other measure(s) where not eg perhaps housing

WDC to lead by example

Testun llawn:

1.1.2 Set specific and ambitious maximum carbon emission standards. Can we adopt specific carbon emission targets in kwhr/m2/yr (not just percentages) as is widely recommended? And make the energy efficiency first principle first and more strongly - the cheapest energy is the energy we do not use.
Where in the document do we specify BREEAM for all developments, domestic and non-domestic now that CC3 is being superseded? Or does BREEAM apply only to non-residential buildings - in which case what standard for residential is being specified?
Each BREEAM standard needs to be specifically set by category and date and at maximum energy credits NOT very good to eliminate any non carbon emission/energy loopholes being exploited.
1.1.3 WDC as building and landowner should already be leading more strongly by example, by applying the proposed DPD standards - or better - in all projects since the CEAP was adopted, not waiting for formal DPD adoption; for example in Kenilworth Leisure, Spencer Yard and any others from WDC or partners in the pipeline.

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

1.2 About Warwick District

ID sylw: 72180

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Incorporate references to minimum dwelling densities and co-location.

Risk of being far from net zero objective if most new homes not and retrofitting is limited.

Include retrofitting standards and planned inspections by zero-engineers. Ambition as well as flexibility required here. Discourage demolition to minimise net additions of embedded carbon.

Testun llawn:

The role of the District in generating inward and outward flows of commuter traffic (principally to/from Coventry and Birmingham) should be highlighted. To minimise carbon emissions from current and future traffic flows the DPD should explicitly favour new development with minimum dwelling densities (NPPF paras 124/5) especially along public transport routes; and co-located as far as practical with planned employment locations (both within and outside the District), to encourage shorter journeys and greater use of active transport

How can this DPD ensure that new development does not add to the District's deficit if the many thousands of new homes envisaged will NOT be net zero and there will be significant retrofitting?

1.3.1 The objective should also cover standards not just for new buildings but for all retrofitting, refurbishment, conversion and extension projects on existing buildings; and planned sample inspections by trained zero-engineers to ensure objective emissions are being sustained.
It is recognised that these standards may need to be more practical and flexible for existing buildings but should be as explicit and ambitious as possible. They also need to reflect an associated objective to encourage refurbishment of old stock rather than demolition/newbuild in order to minimise net additions to embedded carbon. See comments under section 9 & 10 below

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

2 National Context

ID sylw: 72181

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Support the objective to bring forward Future Homes Standard policies in Warwick District. However could this be more ambitious? Have we considered the policies developed by Bath, Central Lincolnshire, Greater Cambridge for example?

Testun llawn:

Support the objective to bring forward Future Homes Standard policies in Warwick District. However could this be more ambitious? Have we considered the policies developed by Bath, Central Lincolnshire, Greater Cambridge for example?

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

3.1 National Planning Policy Framework (NPPF), July 2021

ID sylw: 72182

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Add reference to paras 124/5 (more efficient dwelling densities) and section 12 paras 126 to 136 (the importance of good design) to put the emphasis on sustainability in a fuller balanced planning context.

Testun llawn:

Add reference to paras 124/5 (more efficient dwelling densities) and section 12 paras 126 to 136 (the importance of good design) to put the emphasis on sustainability in a fuller balanced planning context.

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

3.2 Planning Practice Guidance updated in 2019

ID sylw: 72185

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

See last comment. Will new guidance on density and design (Plan, DPD or SPD) be required to incorporate new carbon emission standards?

Testun llawn:

See last comment. Will new guidance on density and design (Plan, DPD or SPD) be required to incorporate new carbon emission standards?

Cefnogi

Net Zero Carbon Development Plan Document - Regulation 19

3.3 Warwick District Local Plan 2011-2029, adopted September 2017

ID sylw: 72186

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Useful background

Testun llawn:

Useful background

Cefnogi

Net Zero Carbon Development Plan Document - Regulation 19

3.4 Neighbourhood Development Plans (NDPs)

ID sylw: 72187

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Useful background

Testun llawn:

Useful background

Sylw

Net Zero Carbon Development Plan Document - Regulation 19

4 Aims and Objectives

ID sylw: 72189

Derbyniwyd: 08/06/2022

Ymatebydd: Warwick District Labour Party

Crynodeb o'r Gynrychiolaeth:

Clarify policy on unregulated emissions

Extend policy to existing building conversions and developments

Toughen 'as early as possible' and commit all developments/refurbishments of WDC land/property from 2022 to net zero.

Clarify if gas is ruled out in 7.3. If not apply specific conditions to enable future low cost retrofitting

Testun llawn:

What does the policy aim to deliver in terms of unregulated energy emissions - is that also net zero? This needs to be made clear.

Not just newbuilds - see detailed Comment under 1.3.

Expand 'earlier where possible' to include a firm commitment to apply this net zero policy to all current and future developments/refurbishments of WDC property and land.

Is gas explicitly ruled out as implied by 7.3? If not, some hard conditions need to be stated and applied to avoid significant additional costs for future owners when fitting air source heat pumps:
· No combi boilers
· No microbore pipes
· Need to allow internal space for a hot water cylinder and heat store.
· The cylinder should be equipped with an immerser linked to the PV panels.

Am gyfarwyddiadau ar sut I ddefnyddio’r system ac I wneud sylwadau, gwelwch ein canllaw cymorth.