Canlyniadau chwilio Gallagher Estates
Chwilio o’r newyddGwrthwynebu
Preferred Options
North of Milverton, Leamington Spa
ID sylw: 49983
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
Objects to site North of Milverton. The Plan fails to demonstrate exceptional circumstances for releasing the site from the Green Belt and the development of this site, along with land east of kenilworth, will reduce the gap between Leamington Spa and Kenilworth.
See attached documents
Gwrthwynebu
Preferred Options
Blackdown
ID sylw: 49985
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
Objects to allocation of land at Blackdown. The Plan fails to demonstrate exceptional circumstances for releasing this site from the Green Belt and the Joint Green Belt Study suggested this site was not suitable for consideration for development.
See attached documents
Gwrthwynebu
Preferred Options
Meeting the Need for Affordable Housing
ID sylw: 49991
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The Preferred Option housing requirement of 600 homes per annum is lower than the affordable housing need and therefore the Plan will not meet the need for affordable housing. The housing requirement should be increased to 17,500 which would be in excess of the affordable housing need. If needs are not met, the poorest in society will be further marginalised.
See attached documents
Gwrthwynebu
Preferred Options
A. Affordable Housing on Housing Development Sites
ID sylw: 49993
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The requirement for 40% affordable housing should remain flexible as this level will not be deliverable on all sites.
The Affordable Housing Viability assessment failed to take into account site remediation and the provision of infrastructure. These can impact on viability. It is important, therefore, to ensure that the policy is flexible.
See attached documents
Gwrthwynebu
Preferred Options
A. General Market Housing
ID sylw: 50007
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The policy refers to meeting the needs as identified in the Strategic Housing Market Assessment. However this information is already out of date being based on 2011 information. There may be justification for a specific mix and type of housing on a specific site or in a specific location. Developers have a good understanding of the markets and will only build what there is demand for in the area.
See attached documents
Gwrthwynebu
Preferred Options
B. Lifetime Homes
ID sylw: 50015
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The requirement for Lifetime Homes should not be a requirement in planning policy. It imposes an additional financial burden on developers and the cumulative effect of all such requirements should be fully evaluated and justified (NPPF paras 173 and 174).
See attached documents
Gwrthwynebu
Preferred Options
C. Homes for Older People
ID sylw: 50019
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
PO6 should not contain a requirement that all strategic sites should include an Extra Care facility. Extra Care is a particular sector of elderly persons housing scheme and cannot be prescribed in planning policy.
See attached documents
Gwrthwynebu
Preferred Options
PO10: Built Environment
ID sylw: 50025
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The aspirations for high quality design are supported but the reference to the principles of Garden Towns, Suburbs and Villages and the prospectus in Appendix 3 implies that this approach is now confirmed and accepted by the Council. These principles need to be the the subject of consultation with other agencies, including the Highways Authority, before a working set of guiding principles can be developed.
See attached documents
Gwrthwynebu
Preferred Options
PO12: Climate Change
ID sylw: 50042
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The 20% policy lacks flexibility, is not the most appropriate strategy and is not in accordance with Government guidance in NPPF paragraph 95.
Many developers are currently looking at reducing carbon emissions by using a "fabric first" approach. For example, the AimC4 consortium is seeking ways to achieve 25% CO2 reduction required between the future Part L 2013 Building Regulations and the current Part L 2010 Building regulations at no additional cost. Carbon reduction is enshrined in current and future Building Regulations and so there is no need for a further layer. In reality, the market will dictate the level of energy efficiency and carbon reduction in new homes over and above legal requirements.
See attached documents
Gwrthwynebu
Preferred Options
PO15: Green Infrastructure
ID sylw: 50049
Derbyniwyd: 03/08/2012
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
Objects to the replacement of Green Network with Green Wedges. there is sufficient protection of the countryside with Green Belt and nature conservation policies.
See attached documents