BASE HEADER

Preferred Options

Chwilio sylwadau

Canlyniadau chwilio Bluemark Projects

Chwilio o’r newydd Chwilio o’r newydd

Gwrthwynebu

Preferred Options

TABLE 7.2 Distribution of Housing

ID sylw: 50809

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

3.6 In addition, we find the reference at the end of Paragraph 7.22 to the need to provide housing to support a "Regional Investment Site" in the vicinity of the A45/A46 junction near Coventry Airport inexplicable and inappropriate. It is indicated in Paragraph 7.22 that the over-provision which the Council believes it has made in respect of new housing will enable additional housing to be provided near Coventry Airport. We fail to see how this is the case, as the total of 8,360 is accounted for by other developments identified in Warwick District. Further housing release near Coventry Airport would therefore add to this total. We have seen no proposals with regard to the Coventry Gateway Proposal at Coventry Airport for new housing to be built in the Green Belt, either in Coventry or Warwick. If such a move is to be proposed through the Warwick Local Plan, this will clearly be to meet housing needs arising in Coventry, and we would expect to see it justified fully by evidence of joint working between the respective Authorities in order to meet unmet need arising in Coventry within the Green Belt in Warwick.

Gwrthwynebu

Preferred Options

PO4: Distribution of Sites for Housing

ID sylw: 50810

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

The identification of land in the Green Belt for residential development through the plan making process can only be justified in exceptional circumstances, in accordance with Paragraph 83 in the NPPF. We do not believe that the Council can sustain the view that such exceptional circumstances exist where it has not first considered all other options for sustainable development on land outside the Green Belt. In the case of north of Common Lane, Kenilworth, this site should be identified as an allocation for residential development for c.65 dwellings, in policy PO4: Distribution of Sites for Housing.

Gwrthwynebu

Preferred Options

PO5: Affordable Housing

ID sylw: 50811

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

The Preferred Options document acknowledges that it is not possible for the overall level of housing growth proposed to meet the arising requirements for affordable housing, as the annual arising need for affordable housing is 698,which is in excess of the proposed annual requirement of 600 dwellings per annum. In addition, as the windfall element is likely to consist of smaller sites they are unlikely to contribute towards affordable housing delivery exacerbating the shortfall. The housing requirement is therefore not addressing the need for all types of housing as required by paragraph 159 of the NPPF. In addition, the title to this subsection is incorrect as the Local Plan does not meet the need for affordable housing.

As identified in the accompanying Housing Evidence Review Paper, it is advised that a higher housing requirement is appropriate taking into consideration relevant factors. Such a requirement, in the order of 17,500, is in excess of the total arising affordable housing need (12,564 dwellings based on an average of 698 dwellings per annum over 18 years) and would assist to deliver a greater amount of affordable housing.

There is concern that if the overall arising housing needs (for both market and affordable) are not catered for, the poorest in society will be further marginalised (i.e. remaining as concealed/ shared households, when accommodation within the private rented market is potentially beyond their means) and could result in such groups moving out of the District to locations where dwellings that are affordable are available. Such an outcome would have a detrimental effect on society both socially and economically. For example, family/ social networks are broken, which potentially places a greater burden on local services and it could lead to a mismatch between available local labour and jobs, which could result in increased commuting.

In terms of the proposed policy approach, which requires 40% affordable housing on developments of 10 or more dwellings in the urban area and 5 or more dwellings in the rural area, it is important that the policy approach remains flexible as this blanket level of affordable housing will not be achievable on all development sites.

It is acknowledged that an Affordable Housing Viability Assessment has been prepared in order to test varying percentages for the affordable housing policy. Such assessments are based upon key variables to test the impact of different levels of affordable housing provision. The key variables set out within the report are: market position, location, value area, density, tenure split and developer profit. There are a number of other factors which have not been taken into account such as site remediation and provision of infrastructure. These can have a huge bearing over whether a scheme is viable or not.

Assumptions in relation to each of the key variables are used to determine viability. There is concern that given no two sites are the same general assumptions in respect of the cost and revenues of development may be inaccurate. It is therefore essential that the Council allows a flexible approach to delivering affordable housing in order to ensure that development is not prevented from coming forward as a consequence of a rigid policy approach. Similar sentiments are echoed in the Ministerial Statement of March 2012 and NPPF, both of which seek to facilitate housing delivery and ensure that Local Plans do not impose unnecessary burdens that could threaten the viability of development.

Gwrthwynebu

Preferred Options

PO6: Mixed Communities & Wide Choice of Housing

ID sylw: 50812

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

It is welcomed that the PO6: Mixed Communities and a Wide Choice of Homes does not include a prescriptive approach to house sizes and types to meet the needs of communities. There is a reference to such information being set out within the Strategic Housing Market Assessment. There is concern, however, that this document may not be updated regularly and therefore the information in relation to housing mix and type may become out of date. Indeed the information contained within the Strategic Housing Market Assessment is already out of date to some extent as it relies on data from 2011. Further, although information is set out at a sub district level, there may be a justification for a specific mix and type of housing on a specific site or in a particular locality and therefore the Council should ensure the policy is sufficiently flexible to deal with such circumstances. We believe that housing developers have a good understanding of the markets within which they operate, as ultimately they will only build what there is demand for in the area.

Gwrthwynebu

Preferred Options

B. Lifetime Homes

ID sylw: 50813

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

The Preferred Option also requires at least 25% of homes, across all tenures, on sites of 50 or more dwellings to be built to Lifetime Home standards. This is a discretionary standard and whilst a number of house builders do achieve lifetime homes standards voluntarily. It should not be compulsory through planning policy. As with any policy which imposes an additional financial burden on developments, the requirements of Paragraphs 173 and 174 of the NPPF are especially relevant.

We have seen no assessment of the cumulative impact of all of the requirements and local standards set out in the Preferred Options document, and unless evidence is produced which supports the imposition of these, the Local Plan cannot be justified.

Gwrthwynebu

Preferred Options

Preferred Option: Planning for Renewable energy and Low Carbon Generation

ID sylw: 50814

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

There is concern that this policy approach lacks flexibility and is not the most appropriate strategy. In particular, it is not in accordance with Paragraph 95 of the NPPF.
Reducing energy use through a 'fabric first' approach is something that many developers are currently looking at and is therefore a realistic and deliverable way forward for reducing carbon emissions. For example the AimC4 consortium is seeking ways to achieve the 25% CO2 reduction required between the future Part L 2013 building regulations and the current Part L 2010 building regulations at no additional cost. This would effectively move, in relation to Part L, from Code for Sustainable Homes Level 3 to Level 4 without increasing build costs.

Any future policy on CO2 reduction should begin with energy conservation and efficiency before looking at on-site or off-site renewables / low carbon solutions. The way in which new residential development will meet the carbon reductions required in building regulations is not prescribed and therefore could comprise of a range of solutions but it appears that 'fabric first' is generally the route being pursued by house builders, and as such is a realistic cost effect way of delivering reductions. In view of the fact that carbon reduction is enshrined in current and future building regulations legislation there is no basis for adding a further layer of policy through in the Local Plan. In addition, all development must be planned for its lifetime. Reliance on technologies which may well stop working or become obsolete before the end of the life of the development should therefore be avoided. It is, for example, questionable whether solar PV panels imported from the Far East and added to developments represent a sustainable, long term solution to reducing carbon emissions.

The reference to on-site energy efficiency measures and low or zero carbon energy generation to meet a carbon reduction equivalent to 20% of predicted energy requirements is not considered to be justified. As noted above the 2013 Part L building regulations will already see a 25% improvement in CO2 emissions over current Part L building regulations (and a 44% improvement over the 2006 version). By aligning Category 1 (Energy and Carbon Dioxide Emissions) of the Code for Sustainable Homes with Part L of the building regulations the Government are maintaining a realistic timetable to reducing carbon emissions. The emerging Local Plan is taking a contrary approach whereby it is seeking to force measures onto new development prior to the national timetable without exploring the consequences.
In reality, in respect of house building it is the market that will really dictate the level of energy efficiency and carbon reduction in new homes over and above legal requirements. If buyers are prepared to pay the additional premium for zero carbon homes then the development industry will build them. However at the moment evidence suggests that reducing carbon emissions is not top of the list when purchasing a property, particularly when peoples' incomes are under pressure from other sources.

Gwrthwynebu

Preferred Options

Preferred Option: Climate Change Adaptation

ID sylw: 50815

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

3.23 There is no objection to reducing the impact development has on climate change but, in respect of new housing, the policy takes no account of the cost implications that will arise from the measures, a burden that will ultimately fall on the house buyers. As previously noted, Paragraph 174 from the NPPF requires local planning authorities to assess the cumulative impact on the implementation of the Local Plan of all local standards, in order for the plan to be justified.

3.24 The Government has not made achieving a particular level against the Code for Sustainable Homes mandatory i.e. the rating can be zero. Whilst the legal requirement to reduce CO2 emissions is currently the equivalent of Code 3, and next year it will be Code 4, there is no legal requirement to meet the CO2 emission equivalent of either Code 5 (100% improvement) or Code 6 (zero net). Paragraph 95 of the NPPF states that when setting any local requirement for a building's sustainability local planning authorities should do so in a way consistent with the Government's zero carbon buildings policy and adopt nationally described standards. The emerging Local Plan is seeking to go beyond these without justification.

Gwrthwynebu

Preferred Options

Green Wedges

ID sylw: 50816

Derbyniwyd: 02/08/2012

Ymatebydd: Bluemark Projects

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

We object to the proposal to replace 'Areas of Restraint' with Green Wedges. There is no basis in the NPPF for adding a layer of protection or restriction over development in addition to the Green Belt, or above such areas which local communities may seek to identify as Local Green Space.

3.26 The NPPF contains, as one of its core principles in Paragraph 17, reference to recognising the intrinsic character and beauty of the countryside. Large parts of the District are covered by Green Belt designation, with its well established levels of control over development, and the NPPF at Paragraphs 76 and 77 allows local communities, in defined circumstances, to designate land as Local Green Space. Areas of particular nature conservation or habitat value can be afforded protection through the hierarchy of designated sites. There is no justification, therefore, for adding a further layer of 'Green Wedges' and all references to this approach should be deleted.