Preliminary Draft Charging Schedule
Chwilio sylwadau
Canlyniadau chwilio Gallagher Estates
Chwilio o’r newyddGwrthwynebu
Preliminary Draft Charging Schedule
CIL Preliminary Draft Charging Schedule
ID sylw: 56275
Derbyniwyd: 29/07/2013
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
A significant proportion of the new housing proposed to be delivered through the Local Plan is on greenfield sites. Harman guidance points out the costs of servicing large greenfield sites and the significance of understanding these. This should be referred to in any update of the evidence base.
see attached
Gwrthwynebu
Preliminary Draft Charging Schedule
CIL Preliminary Draft Charging Schedule
ID sylw: 63287
Derbyniwyd: 29/07/2013
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
Concerned regarding the relationship between CIL and the continued use of s106.
There needs to be absolute clarity between the relationship and the extent to which s106 will be required on individual schemes.
Will education, open space/leisure contributions be financed through CIL or s106?
see attached
Gwrthwynebu
Preliminary Draft Charging Schedule
CIL Preliminary Draft Charging Schedule
ID sylw: 63288
Derbyniwyd: 29/07/2013
Ymatebydd: Gallagher Estates
Asiant : Pegasus Group
The CIL Viability Study make a blanket assumption of £10,000 per unit but there is no explanation of the basis for this assumption. There is therefore a lack of clarity between CIL/s106. The future charging schedule address this and be accompanied by a clear explanation.
£90.00 per sqm on strategic sites zone B CIL for residential will impact significantly. The level to which CIL can be implemented without impacting on viability needs to be clearly established and the relationship between s106 needs to be set out.