BASE HEADER

Village Housing Options and Settlement Boundaries

Chwilio sylwadau

Canlyniadau chwilio Home Builders Federation Ltd

Chwilio o’r newydd Chwilio o’r newydd

Gwrthwynebu

Village Housing Options and Settlement Boundaries

Green Belt Villages and Insetting

ID sylw: 61382

Derbyniwyd: 20/01/2014

Ymatebydd: Home Builders Federation Ltd

Crynodeb o'r Gynrychiolaeth:

-The Revised Development Strategy consultation also proposed that for villages currently "washed over" by Green Belt new village envelopes would be established (Paragraph 4.4.2). However the settlement boundaries shown on the Village Plans in Section 7 of the current consultation are very tightly drawn around the existing built up areas of these villages.

Testun llawn:

see attached

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

Revised Development Strategy

ID sylw: 61763

Derbyniwyd: 20/01/2014

Ymatebydd: Home Builders Federation Ltd

Crynodeb o'r Gynrychiolaeth:

-The interim level of growth of 12,300 between 2011 and 2029 is not accepted as an appropriate housing requirement for WDC.
-Coventry and Warwickshire Joint SHMA identifies 720 dwellings per annum equivalent to 12,960 dwellings over the Local Plan period.
-A shortfall exists between the housing numbers proposed in the Draft Hierarchy Report and the 'Village Housing Options and Settlement Boundaries' document.
-The Local Plan would not be compliant with the requirements of the NPPF with respect to the District's absence of a five year supply of land and the Joint SHMA Final report recommendation for a higher housing requirement.

Testun llawn:

see attached

Atodiadau:

Am gyfarwyddiadau ar sut I ddefnyddio’r system ac I wneud sylwadau, gwelwch ein canllaw cymorth.