BASE HEADER
Preferred Options for Sites
Chwilio sylwadau
Canlyniadau chwilio Environment Agency
Chwilio o’r newyddSylw
Preferred Options for Sites
GTalt02 Wood Yard, Rugby Road, Cubbington (amber)
ID sylw: 65600
Derbyniwyd: 12/05/2014
Ymatebydd: Environment Agency
Any application would require a Preliminary Risk Assessment to assess the possible impact of contamination on water receptors.
A suitable means of dealing with foul effluent will be required.
see attached
Sylw
Preferred Options for Sites
GTalt03 Land at Henley Road/Hampton Road, Hampton-on-the-Hill (amber)
ID sylw: 65601
Derbyniwyd: 12/05/2014
Ymatebydd: Environment Agency
Any application would require a Preliminary Risk Assessment to assess the possible impact of contamination on water receptors.
A suitable means of dealing with foul effluent will be required.
see attached
Sylw
Preferred Options for Sites
GTalt12 Land at Barford By-Pass (green)
ID sylw: 65602
Derbyniwyd: 12/05/2014
Ymatebydd: Environment Agency
Any application would require a Preliminary Risk Assessment to assess the possible impact of contamination on water receptors.
A suitable means of dealing with foul effluent will be required.
see attached
Sylw
Preferred Options for Sites
GT06 Land at Park Farm/Spinney Farm (amber)
ID sylw: 65603
Derbyniwyd: 12/05/2014
Ymatebydd: Environment Agency
Any application would require a Preliminary Risk Assessment to assess the possible impact of contamination on water receptors.
Regardless of the floodplain extent, the watercourse and ponds must be protected and buffered from any development.
Site is unlikely to connect to the foul mains sewer. The nearest water body for discharge is therefore the Tach Brook but it is failing in its objectives due to high phosphate levels. The site is therefore not desirable due to its impact on the water environment.
A suitable means of dealing with foul effluent will be required.
see attached