ID sylw: 65261

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to the Plan period of 2011- 2029. It is considered that the plan period should be extended from 2029 to 2031. The current approach is considered 'unsound' as it does not conform with the provisions of NPPF which requires Plans to cover an appropriate time period, preferably a 15 year time horizon, but which takes account of longer term requirements.

Gwrthwynebu

Publication Draft

DS6 Level of Housing Growth

ID sylw: 65267

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to the proposed level of housing growth of 12,860 new homes between 2011 and 2029. It is considered that the plan period used should be 2011 to 2031. The appropriate level of housing should be increased by at least 1,428 dwellings to provide for the additional 2 years and the plan period should extend to 2031.

The current approach to meeting the housing requirement for the District does not take into consideration any shortfall of housing within the sub-regional housing market area or within adjoining housing market areas.

Gwrthwynebu

Publication Draft

DS7 Meeting the Housing Requirement

ID sylw: 65278

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes objects to Policy DS7 and the associated table as the period used for housing provision should extend to 2031.A C Lloyd Homes consider that there is an over estimate of the likely delivery from windfalls during the plan period. The amount of housing to be allocated on new sites within the plan should be increased from 6,238 to at least 8,000 both in order to meet the shortfall from the missing 2 year period to 2031 and also to allow for a lower delivery from windfalls.

Gwrthwynebu

Publication Draft

DS10 Broad Location of Allocated Sites for Housing

ID sylw: 65279

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to Policy DS10 as the overall housing numbers being provided for are too low, and specifically, the allocation of numbers to the Growth Villages is too low. It is considered that the shortfall in numbers should be met (at least in part) through an increase in the number of homes being provided for within the Growth Villages and the rural area, and should be more in line with the numbers proposed in the earlier versions of the Local Plan which were double that now proposed

Gwrthwynebu

Publication Draft

DS11 Allocated Housing Sites

ID sylw: 65281

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to Policy DS11 as the overall housing numbers being provided for are too low. It is considered that additional sites should be included to make up the shortfall, and greater flexibility should be built into development within the Growth Villages.

The current approach of allocating a small number of sites with very tightly drawn settlement envelopes is inflexible and there is a very real danger that limited choice is being provided. Two sites that could assist in this shortfall at Spring Lane, Radford Semele and Seven Acre Close Bishop's Tachbrook.

Gwrthwynebu

Publication Draft

H1 Directing New Housing

ID sylw: 65284

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd is in general support of the approach set out in Policy H1 to directing new housing on the basis of the settlement hierarchy.

It is however considered that the subsequent explanation and linked policies to this do not allow this policy to be fully delivered. Specifically the policy states that it will direct new development to Growth Villages, but the later approach to this is limited solely to allocated sites. It is considered that new housing should not only be allowed on the sites shown on the Policies Map for the Growth Villages, but also on other suitable sites that can assist in meeting the District's housing requirements.

As set out in objections to Policy DS10, it is considered that there is a shortfall in housing provision proposed in this Plan and it is proposed that this shortfall can be accommodated via the Growth Villages. This is detailed further in the response to Policy H10.

Gwrthwynebu

Publication Draft

H2 Affordable Housing

ID sylw: 65291

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to part (b) of policy H2 regarding Affordable Housing. It is considered that the threshold of sites of 5 or more dwellings or 0.17 hectares is too low and disregards the costs of developing small sites over larger one's. This policy will have an adverse effect on the ability of developers to bring forward small sites which can provide a valuable contribution to housing provision across the district. If a higher threshold is introduced this will encourage more sites to come forward.

Gwrthwynebu

Publication Draft

H10 Bringing forward Allocated Sites in the Growth Villages

ID sylw: 65293

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to Policy H10 as it does not provide a sound basis for future development for the Growth Villages. The policy is too narrow and inflexible, provides no choice and adopts an unsustainable approach to the provision of housing for the Growth Villages. In particular, it is considered that new housing should not only be provided on the sites shown on the Policies Map for the Growth Villages, as there are clearly other suitable sites that can assist in meeting the District's housing requirements.

Gwrthwynebu

Publication Draft

15. Radford Semele

ID sylw: 65295

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to the Policy Map for Radford Semele. As set out in the objection to Policy DS11, the Map should include the A C Lloyd site at Spring Lane and the settlement boundary should be adjusted accordingly.

Gwrthwynebu

Publication Draft

16. Bishop's Tachbroook

ID sylw: 65296

Derbyniwyd: 25/06/2014

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

A C Lloyd Homes object to the Policy Map for Bishop's Tachbrook. As set out in the objection to Policy DS11, the Map should include the A C Lloyd site at Seven Acre Close and the settlement boundary should be adjusted accordingly