BASE HEADER

Publication Draft

Chwilio sylwadau

Canlyniadau chwilio Midland Red (South) Ltd. dba Stagecoach Midlands

Chwilio o’r newydd Chwilio o’r newydd

Gwrthwynebu

Publication Draft

Evidence

ID sylw: 65563

Derbyniwyd: 27/06/2014

Ymatebydd: Midland Red (South) Ltd. dba Stagecoach Midlands

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The Plan has failed to evaluate a strategy that better mitigates transport impacts by focusing on sustainable transport measures, which may be more cost-effective and deliverable. The evidence base of the plan with regard to transport impacts has followed, not informed the preparation of the Plan. The LPA has failed to positively consult with Stagecoach to inform the Plan strategy

Atodiadau:

Gwrthwynebu

Publication Draft

TR3 Transport Improvements

ID sylw: 65577

Derbyniwyd: 27/06/2014

Ymatebydd: Midland Red (South) Ltd. dba Stagecoach Midlands

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The Plan has not evaulated, tested for cost-effectiveness, or sufficiently defined, those schemes necessary to mitigate the transport-related impacts of the plan strategy. The Plan is thus not positively prepared, and is therefore unsound as a result.

Without sufficient effective mitigation measures being defined in the Plan, including those that take advantage of the opportunity to achieve a step-cahnge in the uptake of more sustainable modes including public transport, the ability of the Authorities to seek suitable funding from development to deliver an effective mitigation strategy is fundamentally undermined. Thus the Plan is not effective, and unsound as a result.

Atodiadau:

Gwrthwynebu

Publication Draft

H03 East of Whitnash/South of Sydenham

ID sylw: 65580

Derbyniwyd: 27/06/2014

Ymatebydd: Midland Red (South) Ltd. dba Stagecoach Midlands

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Despite evidence previously given that this site cannot, by virtue of its location, be effectively served by public transport owing to its severance from the main bus network and its peripherality, it has nevertheless been included as a draft allocation.

The allocation is contrary to NPPF paragraph 14 being a fundamentally unsustainable location that cannot be made sustainable. It can only be wholly dependent on personal car use, with perhaps, soime limited scope for cycling.

Atodiadau:

Am gyfarwyddiadau ar sut i ddefnyddio’r system ac i wneud sylwadau, gwelwch ein canllaw cymorth.