Yes
Preferred Options 2025
Representation ID: 86150
Received: 12/01/2025
Respondent: Sandy McCaskie
N/A
Other
Preferred Options 2025
Representation ID: 87063
Received: 03/02/2025
Respondent: Mrs Judith Corless
x
Yes
Preferred Options 2025
Representation ID: 87444
Received: 08/02/2025
Respondent: Cllr Andrew Day
None
Other
Preferred Options 2025
Representation ID: 89120
Received: 19/02/2025
Respondent: Stratford upon Avon District Council
Subject to all the comments already made
Additionally it is vital that there is robust phasing plan in the plan to ensure that development occurs broadly evenly across the plan period and there is not a bulge of new development immediatly the plan is approved
Yes
Preferred Options 2025
Representation ID: 89167
Received: 19/02/2025
Respondent: Mr nigel Freeth
we need to limit the development of our green space to protect the environment and enhance the poor grade land to environmental projects and CO2 capture
Yes
Preferred Options 2025
Representation ID: 89168
Received: 19/02/2025
Respondent: Mr nigel Freeth
we must protect our green open spaces to farm or on poor grade land use this for environmental projects and CO2 capture
Yes
Preferred Options 2025
Representation ID: 89169
Received: 19/02/2025
Respondent: Mr nigel Freeth
N/A
Other
Preferred Options 2025
Representation ID: 89464
Received: 20/02/2025
Respondent: Mr Barrie Hayles
Neighbourhood Plans were put in place after vast time was spent by local communities with their elected representatives and should be fully supported by County/District planners without being undermined. Over development often with inadequate existing infrastructure has impacted badly on existing residents, reducing the quality of life. Roads/junctions, water/sewage pipework and health service accessibility and more have deteriorated in South Warwickshire for existing residents due to vastly increased pressure from concentrated population growth. This Plan with so much more development proposed exasperates the problems still further. Commenting on all its enormous complexities and implications is extremely difficult for residents.
Yes
Preferred Options 2025
Representation ID: 89763
Received: 21/02/2025
Respondent: Compton Verney
n/a
No
Preferred Options 2025
Representation ID: 91608
Received: 26/02/2025
Respondent: Maxine Mayer
The whole plan fails to address the Warwickshire Minerals Safeguarded Area (map attached). Whilst this valuable resource for sand and gravel presents financial benefits it can also reduce timely delivery or settlements and strategic growth areas -attached is WCC statutory consultation to the airfield planning application sent to you as an example of impact when EIA's have failed to address this impact.
Yes
Preferred Options 2025
Representation ID: 91731
Received: 26/02/2025
Respondent: Mr Geoff Norman
Sensible
No
Preferred Options 2025
Representation ID: 91841
Received: 26/02/2025
Respondent: Mr Matthew Hetherington
The proposed SG24 development raises significant concerns. Flooding risks (surface and foul) are high. Infrastructure, including transport and connectivity, is inadequate. Train services face parking and timing issues. Increased emissions from traffic, especially during motorway closures, will worsen air quality. Road conditions and access are poor, with many single-track roads. Expected road connections are unsuitable (S278) due to blind spots and biodiversity impacts. There's a lack of schools and medical facilities. The allocation of the Community Infrastructure Levy (CIL) is unclear. Waste management is problematic. The development threatens the village's community feel, historic woodland, and environmental assets, including the canal.
No
Preferred Options 2025
Representation ID: 92018
Received: 27/02/2025
Respondent: Mrs Valerie Whittaker
With regard to site SG07 this land is Green Belt and the purposes of Green Belt to to stop urban sprawl and maintain a distance between towns and villages. In addition, the traffic generated by such an industrial site would cause huge problems for people using the A4177 trying to get to the A46 and beyond. Warwick itself has limited capacity for road expansion and the whole area would be gridlocked.
Other
Preferred Options 2025
Representation ID: 92665
Received: 28/02/2025
Respondent: Bex Thomson
No comment
Yes
Preferred Options 2025
Representation ID: 93051
Received: 01/03/2025
Respondent: Ms Alison Blake
Above my pay grade to alter this
No
Preferred Options 2025
Representation ID: 93970
Received: 02/03/2025
Respondent: Mrs Carina Taylor
It's all too bitty, not joined up, communities will be isolated particularly in the Alcester and Bidford area who will benefit from job opportunities in Leamingtion and surrounding areas. Much better to build a whole New Town!
No
Preferred Options 2025
Representation ID: 94906
Received: 03/03/2025
Respondent: Stratford-upon-Avon Town Transport Group
Suggest adding definition of decentralized energy systems.
Yes
Preferred Options 2025
Representation ID: 95150
Received: 04/03/2025
Respondent: Mrs Susan Frawley
N/A
Yes
Preferred Options 2025
Representation ID: 95318
Received: 04/03/2025
Respondent: Kineton Parish Council
No further comment
Yes
Preferred Options 2025
Representation ID: 95792
Received: 04/03/2025
Respondent: Bloor Homes Western
Agent: Marrons
A number of amendments are proposed to align definitions with national policy.
Yes
Preferred Options 2025
Representation ID: 95875
Received: 04/03/2025
Respondent: Mr Paul Tesh
yes
Yes
Preferred Options 2025
Representation ID: 95984
Received: 04/03/2025
Respondent: Mr Paul Tesh
yes
Other
Preferred Options 2025
Representation ID: 97141
Received: 05/03/2025
Respondent: Alcester Town Council
Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’) has no comments on this Chapter.
Other
Preferred Options 2025
Representation ID: 97287
Received: 05/03/2025
Respondent: Squab Hall Farm
Agent: Mr Jack Barnes
A number of amendments are proposed to align definitions with national policy.
No
Preferred Options 2025
Representation ID: 97309
Received: 05/03/2025
Respondent: Mrs June Holley
NA
Yes
Preferred Options 2025
Representation ID: 98144
Received: 06/03/2025
Respondent: William Davis Limited
Agent: Marrons
A number of amendments are proposed to align definitions with national policy.
Yes
Preferred Options 2025
Representation ID: 98625
Received: 06/03/2025
Respondent: X2 New Settlement Consortium
Agent: Mr Jack Barnes
A number of amendments are proposed to align definitions with national policy.
Yes
Preferred Options 2025
Representation ID: 99316
Received: 06/03/2025
Respondent: Mrs JILL CHAMBERS
n/a
Other
Preferred Options 2025
Representation ID: 99977
Received: 06/03/2025
Respondent: Mr Steven Simpson
I wasn't sure where else to put general comments so here we go:
From reading the responses to the first consolation it is clear there is a large gap in expectation and opinions between developers and residents on a number of points and the officers have pointed this out.
We the public have a right to expect that the council will protect our interests and opinions and not be swayed by the money being held up by developers and land promotors.
No
Preferred Options 2025
Representation ID: 100495
Received: 07/03/2025
Respondent: Mr Stephen Draper
C1 settlement proposal - comments
Existing infrastructure - will not support CI settlement proposal
Transport Assessment - Extra traffic will be forced onto the existing lanes and B roads during settlement construction and subsequent occupation. The surrounding Lanes have unsuitable narrow bridges over the extensive canal routes and also a height restricted railway bridge at Lapworth The major increase of construction traffic and new residents vehicles will increase hazards and dangers and will put pedestrians and horse riders at increased risk, and have a negative impact to the Wellbeing of the current residents of Kingswood, Rowington and Lapworth.