BASE HEADER
Yes
Preferred Options 2025
ID sylw: 101289
Derbyniwyd: 07/03/2025
Ymatebydd: Hallam Land
Asiant : Marrons
Development proposals should endeavour to deliver the infrastructure set out in the transport strategies outlined, but the SWC’s must acknowledge the ability and need for strategic scale sites to deliver infrastructure that is considered important to a local community but not formally identified within an IDP or other transport strategy. Regarding infrastructure requirements for strategic allocations, the SWCs should collaborate with those bringing the site’s forward to understand site-specific requirements. Allocations with overly onerous infrastructure requirements may delay the delivery of sites due to viability or feasibility concerns. Requirements for infrastructure should not undermine the deliverability of the plan.