BASE HEADER

No

Preferred Options 2025

ID sylw: 101301

Derbyniwyd: 07/03/2025

Ymatebydd: Suzanne Harding

Crynodeb o'r Gynrychiolaeth:

Stratford-upon-Avon can’t cope with the volume of traffic already. This development will result in even more traffic coming into or passing through it, wanting to cross at the only two bridges over the river Avon that are already huge bottlenecks. This will lead to even more congestion and gridlocking as well as more air pollution for locals and tourists