BASE HEADER

Other

Preferred Options 2025

ID sylw: 101372

Derbyniwyd: 07/03/2025

Ymatebydd: AC Lloyd - Site 165

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

AC Lloyd raise one issue that the SWLP is to be progressed in two parts. A single SWLP would be much clearer, without the need to save selected existing policies. It would better meet the Government’s expectations to ensure sites are quickly allocated, permitted and developed to drive economic growth. A number of policy areas typically associated with Part2 plans are coming forward in Part 1. If the Councils don't wish to allocate small residential sites at the non-strategic village level, then that aspect could be addressed through an overall requirement figure, criteria-based policies, and neighbourhood plans. See full response.