BASE HEADER
No
Preferred Options 2025
ID sylw: 102069
Derbyniwyd: 07/03/2025
Ymatebydd: BDW Trading Limited
Asiant : Knight Frank LLP
Crynodeb o'r Gynrychiolaeth:
The SWLP acknowledges a housing need of 2,188 dpa per the standard method, totalling 54,700 homes over 25 years but also references the HEDNA at 1,679 dpa (41,975 homes), meeting approximately 76% of the standard method's requirement. The plan period should be extended to at least 30 years for a total of 65,640 homes at minimum. However, based on the evidenced affordable housing need and employment land supply, to comply with the NPPF and address affordable housing needs, the SWLP should plan for the higher figures as set out by the standard method.