BASE HEADER
No
Preferred Options 2025
ID sylw: 102091
Derbyniwyd: 07/03/2025
Ymatebydd: Ms Sue Cole
Crynodeb o'r Gynrychiolaeth:
Development of smaller infill sites must not detrimentally impact on existing residents and appropriate infrastructure should be put in place at the beginning of the process not the end.
Where the call-for-sites has resulted in a number of proposals these should be looked at on a cumulative strategic basis so that impacts on existing infrastructure is properly assessed and mitigated. Local input should be encouraged.