BASE HEADER

Other

Preferred Options 2025

ID sylw: 102155

Derbyniwyd: 07/03/2025

Ymatebydd: IM Land 1 Limited

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

63. The provision of decentralised energy systems and incorporating heating, power and cooling into new developments needs to consider the implications of the 2025 Future Homes Standard (FHS) and whether the provision of heat networks is feasible and viable.
64. IM Land supports the need to utilise low carbon heating for new development. However, further consideration as part of the next stage of the SWLP needs to be given to the feasibility and viability.