BASE HEADER

Other

Preferred Options 2025

ID sylw: 102181

Derbyniwyd: 07/03/2025

Ymatebydd: IM Land 1 Limited

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

71. IM Land broadly support Draft Policy I. Whilst water quality from the development can be managed and controlled, the ability to influence water quality outside of the site is limited. This should be recognised within the policy wording.