BASE HEADER
Other
Preferred Options 2025
ID sylw: 102429
Derbyniwyd: 07/03/2025
Ymatebydd: Hill Residential
Asiant : Turley
Crynodeb o'r Gynrychiolaeth:
Hill Residential has concerns with regards to the approach set out within Draft Policy Direction 1. Whilst the emerging plan has been prepared against the backdrop of changing national policy, the approach as set out is not justified based on the NPPF 2024 and accompanying PPG.
Draft Policy Direction 1 should therefore be redrafted:
“The South Warwickshire Local Plan will make provision for the delivery of at least 2,188 dwellings per annum, this being the minimum need calculated using the standard method. This equates to at least 54,700 dwellings over a 25-year plan period from 2025 – 2050”.