BASE HEADER
Yes
Preferred Options 2025
ID sylw: 102460
Derbyniwyd: 07/03/2025
Ymatebydd: BDW Trading Limited
Asiant : Knight Frank LLP
Crynodeb o'r Gynrychiolaeth:
The integration of green and blue infrastructure such as green space, SuDS and water bodies into developments, aligns with the NPPF and the integration of green and blue infrastructure at Cophams Hill will be embraced so as to enhance biodiversity, climate resilience, and community well-being. Although this may add additional development costs that must be factored into a viability assessment produced with the Pre-Submission SWLP.