BASE HEADER

Other

Preferred Options 2025

ID sylw: 102522

Derbyniwyd: 07/03/2025

Ymatebydd: IM Land 1 Limited

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

Prior to the Regulation 19 consultation, the evidence base must incorporate and thoroughly address the significant updates to Green Belt policy so the plan can be found ‘sound’ and compliant with national policy. More detailed, site specific, assessment work is anticipated to inform later stages of plan making, with stage 2 of the Green Belt Review will assess the performance of specific sites, where these are being considered for development. This should include the Land off Rumbush Lane, Earlswood (ID ref: 179).