BASE HEADER
Other
Preferred Options 2025
ID sylw: 102820
Derbyniwyd: 07/03/2025
Ymatebydd: Severn Trent Water
Crynodeb o'r Gynrychiolaeth:
This development will likely require treatment at Shipston - Fell Mill (STW) Treatment Works, this Wastewater Treatment Works has medium capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. To accommodate growth at this site, extensive wastewater treatment works upgrades would be required. Overall this development site is considered a high risk location.