BASE HEADER
Other
Preferred Options 2025
ID sylw: 103629
Derbyniwyd: 07/03/2025
Ymatebydd: Phil Kohler
The approach has many excellent features, but there are still a large number of sites being proposed that extend existing residential areas. Not enough is being taken into account of the impact that additional traffic will have on existing neighbourhoods, which all have their own traffic blackspots.
It is extremely disappointing that no traffic modelling has been done yet that would show the capacity of some of the key pinch points within our towns. For example, Leamington has 4 bridges over the River Leam, 5 railway bridges and 5 canal bridges. These been that key north / south routes have a limited capacity, which is already exceeded on a regular basis. All future development must take these key constraints into account or come up with compelling mitigations.