BASE HEADER
No
Preferred Options 2025
ID sylw: 103813
Derbyniwyd: 07/03/2025
Ymatebydd: Mr Micheal Dylan
Crynodeb o'r Gynrychiolaeth:
A3400 and A46 are not suitable for additional traffic and the congestion that additional cars and lorries will bring. This will impact on the established village as lanes will be used as rat runs, with lanes being unsuitable for traffic volume. Impact on Tourism as historic village centre in Wilmcote will be spoiled.Flood issues potential increase in featherbed lane as vehicles wash flood water into houses as they pass them. Strength of railway and canal bridge will be challenged with additional cars/ lorries. Blue Clay (in geology report) in field alongside Featherbed lane, expense of building on this needs considering