BASE HEADER
No
Preferred Options 2025
ID sylw: 104361
Derbyniwyd: 07/03/2025
Ymatebydd: Mr Joe Rukin
Crynodeb o'r Gynrychiolaeth:
SG01, with SG02 and sites identified in the HELAA Part B call for sites seems to be designed to fill in to HS2 from both sides, connecting Coventry, Kenilworth, Burton Green and Stoneleigh. The Green Belt study is fundamentally flawed as it dismisses HS2 as a factor impacting the Green Belt meaning it and the SWLP itself are unfit for purpose. The Green Belt serves to prevent urban sprawl and the joining up of large built-up areas. SG01 & SG02 do exactly the opposite of this.