BASE HEADER
No
Preferred Options 2025
ID sylw: 104682
Derbyniwyd: 07/03/2025
Ymatebydd: Mr Bertram Richter
Crynodeb o'r Gynrychiolaeth:
I'm outraged by the short-sightedness of this proposal. I am particularly appalled that SG17 is considered as a strategic growth site for several reasons (outlined in the document attached at step 7), in particular the lunacy and extreme danger of building in flood zones 2 and 3. The Stour floods severely, blocks roads and the stone bridge several times a year (photos/videos attached) and into my back garden with 42% of the Fell Mill site in flood zones 2 and 3. Shipston does not have the local amenities, publish services or infrastructure to support this plan.