We support Draft Policy I, which requires development proposals to ensure that there is adequate water supply to serve new development and also requires the use of suitably designed SuDS schemes to manage surface water runoff.
We consider that the SG15 Strategic Growth Option is capable of achieving an adequate water supply to serve new development in this location. Jubb has produced a Flood Risk, Drainage and Water Supply Review (Appendix 3) which provides details of engagement with Severn Trent Water (STW) on this matter. It is anticipated that the wider SG15 development proposals can be provided with a new potable water supply from the existing local STW infrastructure which runs throughout the area. STW have also confirmed that the existing supply main within the A429, which roughly bisects SG15, is capable of supplying the development proposals at Coppington Farm, Wellesbourne without the need for significant upgrading.