BASE HEADER

No

Preferred Options 2025

ID sylw: 105812

Derbyniwyd: 06/03/2025

Ymatebydd: Nick Drabble

Crynodeb o'r Gynrychiolaeth:

There is inadequate infrastructure to support the development of 6,700 homes. The area is prime agricultural land and exiting brownfield sites should be prioritised. Due to rural location the residents will be forced to use the car increasing road traffic and sir pollution. New development residents will be forced to use Bearley Road and through Smiths Lane in Snitterfield, passing the primary school and the residential centre of the village. In addition Gospel Oak Lane as a cut through to the A46 northbound and Featherbed Lane through Wilmcote for those heading West will become commuter routes. Ingon Lane with its poor turnout into Warwick Road southbound will also have intensified traffic. None of the above roads are suitable for traffic intensification and all have special hazards increasing risk. In addition the existing junctions of Gospel Oak Lane and Kings Lane either side of the de-restricted A46 already represent a significant accident risk and any intensification their use should be avoided.