BASE HEADER
Other
Preferred Options 2025
ID sylw: 105950
Derbyniwyd: 15/02/2025
Ymatebydd: Amanda Bradshaw
- I am concerned that neither Figure 5 or Figure 6 (which are key images within the document) include the route of HS2 even though this will be a key feature of the landscape during the plan's lifetime and so think it is important that this is added into the Plan.
- In planning terms HS2 forms a hard landscape feature and permanent solid barrier to the north of Leamington. It is important that development in the greenbelt does not extend over this barrier as it will result in rapid erosion of the greenbelt between Leamington and Coventry, which is already heavily under pressure. I therefore feel the somewhat arbitrary "priority area" circles in Figure 5 North of Leamington should be more specifically demarcated so that the HS2 route forms the northernmost boundary of the priority area to the North of Leamington.