BASE HEADER
No
Preferred Options 2025
ID sylw: 106009
Derbyniwyd: 03/03/2025
Ymatebydd: Carl Nash
Crynodeb o'r Gynrychiolaeth:
The area and all of its infrastructure are above capacity.
Schools are overcapacity the roads cannot handle the ever-increasing traffic. The doctors surgery which is bursting.
The homes proposed will be built in areas that are prone to flooding and either side of a town accessed by single track bridges.
The infrastructure cannot handle any more load. We are a small market town and should be such.
The housing system which has already been imposed on the town had helped pressure the small town to its limit.