BASE HEADER
No
Preferred Options 2025
ID sylw: 106087
Derbyniwyd: 07/03/2025
Ymatebydd: Terry Payne
Surrounding roads - I have experienced the local roads at all sorts of times and all days. They are already very busy, Bishops Itchington & the route to the M40 being awful with congestion at all times. The route into Leamington already being majorly disturbed due to HS2 and the route to Warwick into Warwick already taking upwards of 40 minutes in rush hour.
An additional 4800 home and probably another 6000-7000 road users all heading out onto the local roads is just not going to work.
Flood risks - after a period of wet weather the corner where Harbury Road meets Deppers bridge turns into a reservoir and Harbury Road could be easy mistaken for a river. Ladbroke in general historically does not cope well with heavy and/or persistent rainfall. As you’ll know the proposed plans of F2 is largely on hilly terrain so therefore the knock-on effect of this is going to put the properties downhill at even more risk of serious flooding.
I believe there are better options with existing infrastructure which make much more sense. Also better prepared geographically, and also financially better for the tax payer.