BASE HEADER
Other
Preferred Options 2025
ID sylw: 106114
Derbyniwyd: 06/03/2025
Ymatebydd: Mr Jonathan Atkinson
Crynodeb o'r Gynrychiolaeth:
I need to strongly object to houses on site 148. The river and sewage system are overloaded. The school is full. There is little work, commuting is unsustainable and would put pressure on the single track roads through Honington and Barcheston which bypass an already clogged one way system in Shipston