BASE HEADER
No
Preferred Options 2025
ID sylw: 106123
Derbyniwyd: 19/02/2025
Ymatebydd: David Lees
I have reviewed the plan, and as a resident of Pebworth my major concern is road access from the proposed airfield site.
The site is to the south east and south of the River Avon and the major employment locations the West Midlands, Birmingham and Coventry are to the north and west of the airfield site.
To access these locations it is necessary to cross the river Avon. Currently there are two 14th Century bridges under traffic light control in Bidford and Welford that can only support light traffic. The only alternative is to travel into Stratford upon Avon centre to access one of two bridges to gain access travel north or north east .
Therefore to enable the development of for than 11,000 dwelling a significant upgrade in the roads infrastructure will be required around the bottlenecks as in Bidford, Welford and Stratford.
I cannot see any reference to roads and access in the planing document and therefore it is not viable