BASE HEADER
No
Preferred Options 2025
ID sylw: 106252
Derbyniwyd: 04/03/2025
Ymatebydd: Stuart Wainwright
Crynodeb o'r Gynrychiolaeth:
Road infrastructure in this area is clearly inadequate to serve the increased commuter traffic that this development would generate. I know first hand the severe impact that is caused by even the slightest decrease in traffic flow due to temporary lights or, a near by diversion or, a road closure due to flooding.
In addition to this, with very limited and infrequent bus and train services to the local area, residents have no real alternative but to drive private vehicles on the roads during peak times.