BASE HEADER

No

Preferred Options 2025

ID sylw: 106533

Derbyniwyd: 06/03/2025

Ymatebydd: Valerie Wilks

Crynodeb o'r Gynrychiolaeth:

I was horrified to see the latest planning proposal for a development of housing known as E1.
The B road will not be able to cope with the extra volume of traffic. Since the developments at the airfield and Meon Vale there have been many more RTAs (not necessarily all recorded because the services have not been involve.). Stratford relies on its tourist industry and any tourist coming from Chipping Campden/Broadway will be greatly delayed travelling on a road that was never built to cope with such an increased volume of cars heavy vehicles and farm vehicles.
All this increased traffic is then funnelled over the Clopton Bridge or the Seven Meadows Bridge. The Clopton Btidge is already over used and the Seven Meadows Bridge only leads into the town where there is a continual traffic jam.
Until a by pass is built on the south side of Stratford there should be no further developments along B4632