BASE HEADER

Yes

Preferred Options 2025

ID sylw: 106653

Derbyniwyd: 07/03/2025

Ymatebydd: Warwickshire Property and Development Group

Asiant : Framptons

Crynodeb o'r Gynrychiolaeth:

We recognise that water resources are under significant pressure and that this is likely to be accentuated as a result of climate change over Local Plan period. The implications of having to meet the BREEAM "excellent" standard for water consumption should though factored into the Viability Assessment produced with the Pre-Submission SWLP.