BASE HEADER

No

Preferred Options 2025

ID sylw: 106671

Derbyniwyd: 07/03/2025

Ymatebydd: Warwickshire Property and Development Group

Asiant : Framptons

Crynodeb o'r Gynrychiolaeth:

We recognise that new development should ensure adequate provision of open space to meet the needs of future residents and that this should be provided on site in the first instance and then off-site, when it can be adequately demonstrated that on-site provision is not feasible. However, the requirement for an off-site contribution to enhance or provide new open space, within 400m of the development should be removed from the policy as there may be cases where there is simply no existing open space within distance threshold or it would not be practical to deliver new open space within the same area. For these reasons such a policy requirement would not be found “sound” at Examination.