BASE HEADER
No
Preferred Options 2025
ID sylw: 106844
Derbyniwyd: 04/03/2025
Ymatebydd: Paul Tilley
Crynodeb o'r Gynrychiolaeth:
Considerable demands will be placed on the major roads in the area (A46, A4177, B4439) by traffic generated from ongoing house building. At peak times these roads are already congested. Proposed development of 8000+ homes at site B1 will exaggerate this. If industrial units are built at site SG07 further traffic including heavy goods vehicles will lead to increased conjestion.
Kenilworth and Warwick are already experiencing large volumes of traffic. The construction of industrial units at SG07 will have a profound effect on the surrounding area. Substantial improvements would need to be made to the road network and would be prohibitively expensive to deliver.