BASE HEADER

No

Preferred Options 2025

ID sylw: 106845

Derbyniwyd: 25/02/2025

Ymatebydd: Pratyush Mahapatra

Crynodeb o'r Gynrychiolaeth:

1. The lack of infrastructure at the moment and therefore the need to create this – more roads,
widening road, etc. This is likely to cause to cause a detrimental traffic delays/disruptions for
many years during the proposed development and afterwards
2. Increased traffic will increase pollution of the area
3. The proposed development will increase the population greatly with increase in traffic flow
4. The increase in the population will pressure on services such as the NHS – Warwick Hospital, GP surgeries and Dental surgeries
5. Need for more nurseries and schools;
6. Increased Disruptions to – Water/sewage Utilities
7. Increased risk of flooding due to building works from removal of trees, hedges and soil;
8. Increased population means increased waste production and the need for their appropriate
disposal;
9. Devastating damage and disruption to the environment and ecosystems - to wildlife and
loss in their habitat
10. There is a lack of employment in area and this can potentially lead to increased crime
11. Violation to the human rights of the existing owners to lead a peaceful family life as per ECHR rules
12. Union View housing development in Hatton, has only recently been completed with a huge increase in population, and corresponding huge number of traffic issues;
13. There are of plenty of brownfield sites that can be developed without this proposal